Jump to content

Kaleswaram project scam gurinchi matladara


kittaya

Recommended Posts

3 minutes ago, kittaya said:

T ppl ni adugu..... 

 

Thread essindi nuvve gaa?  Inka nee daggara mottam lekkala book vundemo anukunna 1 lakh hamphat vi.. inthaki scam ante wasted ana? Dengithinnarana?

Link to comment
Share on other sites

1 hour ago, YOU said:

Thread essindi nuvve gaa?  Inka nee daggara mottam lekkala book vundemo anukunna 1 lakh hamphat vi.. inthaki scam ante wasted ana? Dengithinnarana?

Mallana crying vaa...

Link to comment
Share on other sites

47 minutes ago, ticket said:

Total estimated current bill per year 10k crores

People who don’t have idea about project spew , the cost of operating differs based on the rainy season.

in a good rainy season like last 3 season water flows with gravity from srsp

srsp -> yellampally -> mid manair and all 3 newly constructed barrages kaleshwaram

In a bad season, the water will be take a reverse direction from the confluence point of meddigadda(Pranahita and Godavari)

kaleswaram 1 medigadda -> klis at annaram -> klis 3-> yellampally -> mid manair and srsp

the constant is upwards of mid manair irrespective of rainy season had to be pumped

mid maniar -> mallanna sagar -> kondapochamma -> annaram —> baswapur (optionally nizam sagar and singur but last 3 years filled on its own)

wostt case scenario la 10k crores if srsp doesn’t get a single drop of water

Link to comment
Share on other sites

22 minutes ago, hyperbole said:

People who don’t have idea about project spew , the cost of operating differs based on the rainy season.

in a good rainy season like last 3 season water flows with gravity from srsp

srsp -> yellampally -> mid manair and all 3 newly constructed barrages kaleshwaram

In a bad season, the water will be take a reverse direction from the confluence point of meddigadda(Pranahita and Godavari)

kaleswaram 1 medigadda -> klis at annaram -> klis 3-> yellampally -> mid manair and srsp

the constant is upwards of mid manair irrespective of rainy season had to be pumped

mid maniar -> mallanna sagar -> kondapochamma -> annaram —> baswapur (optionally nizam sagar and singur but last 3 years filled on its own)

wostt case scenario la 10k crores if srsp doesn’t get a single drop of water

in this rainy season no current bill.... beacuse all motors drowned.... and required repair from austria engineers

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...