Jump to content

Recommended Posts

Posted
51 minutes ago, Android_Halwa said:

Minimum oka 50,000 acres vundalantav…

ante oka 4-5 districts land pooling seyalaithe…

Pedda development ae

You jaffas and pinkies keep crying..

2029 lo norlu vellapedataru..

Posted
7 hours ago, ARYA said:

 

2014 to 2019 em cesari vellu 

Posted
7 hours ago, Android_Halwa said:

Ie airport 2029 varaku financial closure chesina , jeevitham la pulka gallani kani andhrollani okka maata kadu kada danda esi dandam pedutha edanna kanipisthe…

 

Te’langa’na gallaki Andhra tho sambandam enti antunna @psycopk

  • Upvote 2
Posted
6 hours ago, Sizzler said:

Mellaga extend chesi Runways kalipestaru Vijayawada airport tho… flight can go Amaravathi or Vijayawada after landing….

Ante flight cum bus service ani mata. Mari appudu Amaravathi railway station nunchi oka line Amaravathi airport ki join chesthe ayipothadhi kadha. Manchi connectivity😎

Posted
3 hours ago, CanadianMalodu said:

Ante flight cum bus service ani mata. Mari appudu Amaravathi railway station nunchi oka line Amaravathi airport ki join chesthe ayipothadhi kadha. Manchi connectivity😎

It works differently. You need to have a vision powered by AI and quantum valley to understand. 

The run way, which will be the world’s longest runway to be built using raft foundation, will be between Vijayawada and Guntur. This runway will be connected by Hyperloop to Amaravati Downtown. So that international business people from Singapore can directly reach Amaravati downtown for business. On both ends are two futuristic and cultural cities Vijayawada and Guntur. Depending on where you go, the flight will land in that direction.

Finally, mee kosam mee bhavishathu kosam…airport kattadaniki 10,000 acres kavaki kabatti oka 50,000 acres land poll cheyali…

  • Like 1
Posted
3 hours ago, nenu_meeku_telusa said:

Te’langa’na gallaki Andhra tho sambandam enti antunna @psycopk

Telugu vayya….we speak the same language..we watch the same movies…

Inthakante pedda sambandham emana vuntada cheppu..

Posted
5 minutes ago, Android_Halwa said:

It works differently. You need to have a vision powered by AI and quantum valley to understand. 

The run way, which will be the world’s longest runway to be built using raft foundation, will be between Vijayawada and Guntur. This runway will be connected by Hyperloop to Amaravati Downtown. So that international business people from Singapore can directly reach Amaravati downtown for business. On both ends are two futuristic and cultural cities Vijayawada and Guntur. Depending on where you go, the flight will land in that direction.

Finally, mee kosam mee bhavishathu kosam…airport kattadaniki 10,000 acres kavaki kabatti oka 50,000 acres land poll cheyali…

Panilo pani aa Krishna nadhi meedha oka port kadithe maaku oka port kooda vasthadhi kadha. Aa hyperloop ki oka station Baboru inti edara isthe, connectivity ki chala help chesthadi. 

  • Haha 1
Posted
3 hours ago, CanadianMalodu said:

Ante flight cum bus service ani mata. Mari appudu Amaravathi railway station nunchi oka line Amaravathi airport ki join chesthe ayipothadhi kadha. Manchi connectivity😎

Only Visionary can visualize the need for a new airport despite Vijayawada airport there. 

Posted

Amaravati or CBN anagane Andhra and TG jagan fans bale kalisipotharu ani antuna @psycopk anna 

Posted
24 minutes ago, Sizzler said:

Only Visionary can visualize the need for a new airport despite Vijayawada airport there. 

VJW airport gannavaram lo vundii; 
gannavaram nunchi amaravati travel time consider chesukoni, aa convoy time, public inconvenience, already congestion issues and no scope to widen the roads like beseant road and eluru road; so anni drusti lo pettukoni they proposed vayya. 

motham kattesinattu enduku aa edupu oka 2 yrs aagi edavandii ani nenu kaadu tammullu antunnaru

Posted
56 minutes ago, Android_Halwa said:

Telugu vayya….we speak the same language..we watch the same movies…

Inthakante pedda sambandham emana vuntada cheppu..

Not same state. Aina andhra talks telugu and telangana talks tegulu. We don’t care antunna andhra youth . 

Posted
Just now, nenu_meeku_telusa said:

Not same state. We don’t care antunna andhra youth 

Andhra Youth kaadhu, only thammulu. 

Posted
Just now, CanadianMalodu said:

Andhra Youth kaadhu, only thammulu. 

Telangana ollaki tammudu Leda?

Posted
3 minutes ago, lollilolli2020 said:

VJW airport gannavaram lo vundii; 
gannavaram nunchi amaravati travel time consider chesukoni, aa convoy time, public inconvenience, already congestion issues and no scope to widen the roads like beseant road and eluru road; so anni drusti lo pettukoni they proposed vayya. 

motham kattesinattu enduku aa edupu oka 2 yrs aagi edavandii ani nenu kaadu tammullu antunnaru

Ivi sare, Dallas nunchi direct ga Amravathi Via Bezjawada service vesthunnara ledha? Adhi cheppu mundhu. Hybrid model jobs aithe kastha soukharyanga untadhi. 1 week Dallas, 3 week wfh in Amaravathi.

Posted
1 minute ago, nenu_meeku_telusa said:

Telangana ollaki tammudu Leda?

Andhra youth lo thammulu don't care anthe, takkina Andhra youth ki Telangana thobpedda issues levu. 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...