Jump to content

Recommended Posts

Posted
21 minutes ago, dhuku said:

Looks like an innovative solution but the problems that arise there after are impossible to fix.

There should be a curved turn instead of full-right turn.

Imagine when there is such huge traffic which grows everyday, you have to take:

One left- one-right, again right - 3 turns...

A big bus will either be blocked or it will block tens of vehicles.

 

Posted
13 minutes ago, MACH said:

 

Net lo share chesevi max without context. 
danni manam gorrella nammi share cheyadam.

 

that bridge is not for vehicles. It is for cattle crossing. Literal ga cheppalante gorrela kosam.

highway ki connected kanpistundi clearga, gorrellu barrellu antavendi bhayya..

Posted
35 minutes ago, halwafan said:

highway ki connected kanpistundi clearga, gorrellu barrellu antavendi bhayya..

Railway track undi. Cattle used to cross the tracks and lot of cattle used to lost their lives in that process. 
 

I know that area and its history. Can’t share more than that.

  • Thanks 1
Posted

Looks like internal road used for non motorized purposes…okaside national highway and underpass road inkoside, railway track mida ie bridge.

ROB needs to be set up at a certain height, a height elevation kosame ie shape select chesinattu vunnaru…one side its not possible because of the highway…the shape makes sense.

Posted
7 hours ago, MACH said:

 

Net lo share chesevi max without context. 
danni manam gorrella nammi share cheyadam.

 

that bridge is not for vehicles. It is for cattle crossing. Literal ga cheppalante gorrela kosam.

not sure baa ... NDTV vaadu vesaadu 

Intended purpose of reducing travel time ani clear gaa raasaadu gorrela kosame ayithe antha wide kadathaara not sure though

Despite its intended purpose of reducing travel time and easing traffic in the Aishbagh area, the bridge became a subject of public concern due to its design and construction delays

Posted
1 hour ago, Naaperushiva said:

not sure baa ... NDTV vaadu vesaadu 

Intended purpose of reducing travel time ani clear gaa raasaadu gorrela kosame ayithe antha wide kadathaara not sure though

Despite its intended purpose of reducing travel time and easing traffic in the Aishbagh area, the bridge became a subject of public concern due to its design and construction delays

This is a real aanimuthyam. They built it for vehicular traffic.

 

the one from penugonda is not for vehicular traffic.

as usual edanna panikoche pani chesukokunda ante trolling chestunnaru mana politicians.

  • Upvote 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...