Jump to content

Modi flags off first Vande Bharat sleeper train, a proud moment to India


Recommended Posts

Posted
7 minutes ago, akkum_bakkum said:

All ICF coaches are being replaced with German made LHB coaches. Now, new make in India motto is to make those same German LHB coaches in India and claim self reliance....all while LHB owns the design and earns on each and every coach made.

@akkum_bakkum, Are you @Kool_SRG?

Posted
On 1/18/2026 at 7:04 AM, krishnaaa said:

"By late 2025, Indian Railways' total track length was around 105,672 km, with significant expansion in higher-speed corridors, though earlier reports projected reaching 120,000 km (1.2 lakh km) by 2025, showing rapid growth from 2014 levels (around 79,342 km) through extensive new line construction (34,428 km between 2014-2025) and modernization efforts"

 

Guntur-Guntakal doubling has been going on since 2015....Still nallamala tunnel works haven't started.

Kotipalli-narsapur line gurinchi cheppakkarle...been hearing since my childhood.

Nallapadu - Bibinagar doubling approval vachi 3 years ayyindi...no work has started.

Nadikudi-srikalahasti new line approval came in 2013. mukki mukki darsi daakocharu, thats 20% completion. ante vision 2047 anukovachu.

Mahabubnagar - dhone doubling going on since 6 years.

Posted
33 minutes ago, akkum_bakkum said:

 

Guntur-Guntakal doubling has been going on since 2015....Still nallamala tunnel works haven't started.

Kotipalli-narsapur line gurinchi cheppakkarle...been hearing since my childhood.

Nallapadu - Bibinagar doubling approval vachi 3 years ayyindi...no work has started.

Nadikudi-srikalahasti new line approval came in 2013. mukki mukki darsi daakocharu, thats 20% completion. ante vision 2047 anukovachu.

Mahabubnagar - dhone doubling going on since 6 years.

 

Posted
26 minutes ago, krishnaaa said:

 

Ittantiyyi vanda videos estha...Reality is always otherwise. Did Mumbai - Ahmedabad bullet train project announced in 2015 complete? All these things look rosy when "I want to/will move to India" thinking is there, but reality hits hard when the move actually happens.

Posted
6 minutes ago, akkum_bakkum said:

Ittantiyyi vanda videos estha...Reality is always otherwise. Did Mumbai - Ahmedabad bullet train project announced in 2015 complete? All these things look rosy when "I want to/will move to India" thinking is there, but reality hits hard when the move actually happens.

I was replying to the post which said not even 5% added since british. Its proven wrong.

btw, Look at this AQI Killer that will come to Indian cars as well.

 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...