Jump to content

Kaveri engine to be installed in 2018


Recommended Posts

Posted

The Indian-built engine for the country’s Light Combat Aircraft (LCA) may be ready for installation in 2018, a senior official of the Defence Research and Development Organisation (DRDO) has said.“The gas turbine engine Kaveri will replace the GE-404 engines which are now being put in the LCA,” DRDO’s chief controller of research and development Prahlada told reporters here.

The Kaveri engine, a Rs.2,000 crore project, is being developed by one of the DRDO labs based in Bangalore, the Gas Turbine Research Establishment (GTRE).

Test runs of the first complete prototype Kaveri began in 1996.

However fed up by the delay in fully developing the engine, the defence ministry shelved its plans to build a fighter aircraft.

The Kaveri engine project got revived in 2006 following a joint venture formed between the DRDO and French company, Snecma, an engine-maker, to jointly develop it to fit in the LCA.

Posted

does it takes this much long time  sCo_hmmthink sCo_hmmthink

Posted

[quote author=Man For The Society link=topic=156654.msg1857983#msg1857983 date=1297898354]
does it takes this much long time  sCo_hmmthink sCo_hmmthink
[/quote]

manam eppdu oka car engine kuda design cheyaledu............alantidi............oka aircraft engine ante............time padutundi kada

×
×
  • Create New...