Jump to content

Recommended Posts

Posted

Two segments of the PSLV-C24 Core Stage during vehicle integration at Mobile Service Tower

jbqYsGd.jpg

Posted

Fully integrated PSLV-C24 Core Stage on the launch platform inside the Mobile Service Towe

 

JJEXSkd.jpg

Posted

One of the Strap-ons being integrated with PSLV-C24 Core Stage at Mobile Service Tower

TkVK1gi.jpg

Posted

PSLV-C24 Strap-Ons are being assembled with Core Stage

 

tNH7egM.jpg

Posted

PSLV-C24 Second Stage in the Stage Preparation Facility

 

 

b0vnyyq.jpg

Posted

Hoisting of PSLV-C24 Second Stage during vehicle integration at Mobile Service Tower

WpAQDIR.jpg

Posted

MST withdrawal exercise during launch rehearsal

Vqbq46u.jpg

Posted

PSLV-C24 in the Mobile Service Tower prior to Satellite Integration

0vIr6HN.jpg

Posted

IRNSS-1B being integrated with PSLV-C24

ytWj66i.jpg

Posted

IRNSS-1B Satellite on top of PSLV-C24 Fourth Stage

NW8TqdC.jpg

Posted

The two halves of PSLV-C24 Payload Fairing enclosing the IRNSS-1B Satellite on the Fourth Stage

MykpBpW.jpg

Posted

MST withdrawal exercise during launch rehearsal

 

7oO13RP.jpg

Posted

Panoramic view of PSLV-C24 on the First Launch Pad with Mobile Service Tower at a distance

EiwqDwT.jpg

Posted

PSLV-C24 Take Off - View 1

SW6JAlA.jpg

×
×
  • Create New...