Jump to content

Here's What Saving $1.3 Billion On A New Stadium Looks Like


Recommended Posts

Posted

svbbkqgozflvvchk7uk6.png

 

 

Yesterday we learned that London-based architect Zaha Hadid had rethought her design for Tokyo's Olympic Stadium, after widespread protests and a major budget cut put the original design in jeopardy. Dezeen has the new images of the redesigned stadium, and it's... pretty damn similar, despite a $1.3 billion budget cut.

 

Dezeen says these renderings were released by Hadid's office, showing a stadium that cost $1.3 billion less than the old design—after the The Japan Sport Council announced a plan cut the cost of the stadium from $3 billion in May. But more than the budget, the architects say this design responds to widespread criticisms of the previous design: That it was too big for the site, that it didn't respect the surrounding public space, and so on. According to Hadid's office, the rethought design will "optimize the investment and make the stadium even more efficient, user-focused, adaptable and sustainable."

 

In reality, it's extremely hard to say whether the stadium's siting has been changed. According to Reuter's report from May, the stadium's roof will be about 16 feet lower, and 725,488 square feet have been cut from the floor area. Still, when that news broke, critics told Reuters it was "a bad imitation of her original," and one that's still too big. Here's a side-by-side comparison of the old (top) and new (bottom) ceilings:

 

hdo8nvopa4kudxplem9a.png

 

 

hdo8nvopa4kudxplem9a.png

 

So how do you pull $1.3 billion out of a building and still make it look fairly similar to the original? In all likelihood, a ton of fat-trimming is going on here. But major changes to the podium and roof are afoot too: Hadid's original had a swooping, structural web that looked bulky as far as materials were concerned. The new roof, while maintaining some of the original geometry, is made from a "lightweight, tensile fabric between the stadium's structure" that "significantly reduces the weight and materials of the roof, giving the stadium even greater flexibility as both an outdoor and indoor venue." That seems to be a nod to another major criticism of the original design: That it would be hard to reuse once the games are over.

 

Is it enough? It's definitely a good direction to be heading in. But either way, I have a feeling this isn't the last we'll be hearing about this debacle. Check out another side-by-side comparisons below.

 

jzxc1je3kslsrfpkikcl.png

 

jzxc1je3kslsrfpkikcl.png

Posted

Brahmi-3_1.gif?13490156021.3 bill cut ayyakkooda antha lavish gaa vundhi... ee standards.. safety precautions... amenities, rooms, monitoring infrastructure.. etc etc ye range yerpaatlu untaayo yento .. interesting

Posted

Newyork lo Madison square inka cost ataga. Bcoz of place it is in middle of NY


Brahmi-8.gif

Posted

Brahmi-3_1.gif?13490156021.3 bill cut ayyakkooda antha lavish gaa vundhi... ee standards.. safety precautions... amenities, rooms, monitoring infrastructure.. etc etc ye range yerpaatlu untaayo yento .. interesting

 

outer structure make ki material marcharu..

 

top dome open chesi..split case chesaru...so tha tit can be both indoor and out door stadium...fabric dome anta adi..

Posted

outer structure make ki material marcharu..

 

top dome open chesi..split case chesaru...so tha ** can be both indoor and out door stadium...fabric dome anta adi..

dual purpose useful .. ok

Posted

dual purpose useful .. ok


Balayya wig lekka antha

Umbrella lekka and bald covering too



Brahmi-8.gif
Posted

Balayya wig lekka antha

Umbrella lekka and bald covering too



Brahmi-8.gif

best comment bro


 

×
×
  • Create New...