Jump to content

Benefits Of Polavaram Project?


Recommended Posts

Posted

enti daani valla anni benefits??.....inpermation kosam....

Posted

1 lakh acres of land will come to irrigation

 

drinking water problems can be solved for entire seemandhra 

Posted

super...papam rayalaseema valaki emanna benefit ayethe better

Posted

super...papam rayalaseema valaki emanna benefit ayethe better

 

polavaram lo water unte.. paina srisailam dam lo neelu seema ki ivochu...

 

water kosam ee pulka kcr gadi langa natakulu chellav...

 

polavaram loki only floods dwara vache water ni save chestaru... (sea loki poye vatini) ilanti project apite andhra valla water flow motham control cheyochu ani lafangi pulka plan

Posted

polavaram lo water unte.. paina srisailam dam lo neelu seema ki ivochu...

 

water kosam ee pulka kcr gadi langa natakulu chellav...

 

polavaram loki only floods dwara vache water ni save chestaru... (sea loki poye vatini) ilanti project apite andhra valla water flow motham control cheyochu ani lafangi pulka plan

 

 

Awesome .. ani anukunatu workout aithe super

Posted

Awesome .. ani anukunatu workout aithe super

pora ...:o
Posted

polavaram lo water unte.. paina srisailam dam lo neelu seema ki ivochu...

 

water kosam ee pulka kcr gadi langa natakulu chellav...

 

polavaram loki only floods dwara vache water ni save chestaru... (sea loki poye vatini) ilanti project apite andhra valla water flow motham control cheyochu ani lafangi pulka plan

antha edupu ento KCR gadiki andhra janala meda...vediki political biksha pettindhi andhra party.......seemandhra baaga develop ayethe vediki insecure aa??

Posted

polavaram project world lone one of the biggest AP ki drinking water and sagu neru also TG ki drinking water for some dist.

Posted

polavaram project world lone one of the biggest AP ki drinking water and sagu neru also TG ki drinking water for some dist.

 

 

 

are you sure ??

Posted

Sonia beach letter raasindi kadaa promise chesinattu polavaram twaraga cheyyamani appatlo

ippudu congress enduku against the project.. whip

inka Sirio em moham pettukuni congress ani maatlaaduthaadi

Posted

are you sure ??

 

yes man polavarm ki link ayyi inka konni projects vunay link of of all the rivers in india $120 billion project 

Posted
Future potential[edit]

A barrage would be constructed on Krishna river located near 16°34′41″N 80°24′43″E in the upstream of Prakasam barrage with FRL at 22m MSL to receive Godavari water diverted from Polavaram dam. This barrage would also enable a new road / bridge link diverting south bound road traffic from Hyderabad side on NH9 to Guntur district without touching Vijayawada city

A low level lift canal from the Krishna river located near 16°42′50″N 80°08′24″E at 20 m MSL in the downstream of Pulichintala dam will be executed to feed Godavari water diverted from Polavaram Dam to some of the existing command area (situated below 60 m MSL) under Nagarjuna Sagar right bank canal to facilitate extension of Nagarjuna Sagar right bank canal connecting to Kandaleru feeder canal / Somasila reservoir for serving irrigation needs in PrakasamPotti Sriramulu Nellore and Chittur districts including Chennai drinking water supply. A branch from this lift canal is also extended up to Pulichinthala dam (FRL 45 m MSL) to store Godavari water in Pulichintala reservoir during drought years and to irrigate low lands along Krishna river up to Pulichintala dam.

Another high level lift canal from above Krishna river location 16°42′50″N 80°08′24″E up to 90 m MSL would be constructed to join Nagarjuna Sagar tail pond (FRL 75 m MSL) irrigating lands enroute along Krishna river in Guntur district. During drought years, the water transferred by this canal to Nagarjuna Sagar tail pond is further lifted to Nagarjuna Sagar and Srisailam reservoirs with existing pumped storage hydro units for use in all the projects receiving water from these reservoirs. This high level lift canal is an alternative to Dummugudem to Sagar lift canal planned in Telangana region which would transfer Godavari river water from Dummugudem to Nagarjuna Sagar tail pond.

Another lift canal drawing water from the Polavaram right bank canal near 16°38′20″N 80°37′53″E at 30 m MSL would be constructed by pumping water to 70 m MSL to irrigate mid lands in Krishna district up to Pulichintala dam. All these pumping stations can be envisaged with high level ponds to incorporate peaking electricity generation capability to achieve multi purpose benefits. Ultimately the Polavaram right bank flood flow canal would be constructed to augment water transfer for meeting shortages in the Krishna river basin and the needed environmental flows downstream of Prakasam barrage. Refer to Google Earth data for more geographical information.

A 25 MW hydropower station can be established utilising Polavaram right bank canal water near Vijayawada. Refer Talk Page

A lift canal starting at 175m MSL receiving water from Polavaram reservoir, would irrigate most of the high lands in West Godavari and Krishna districts. This canal originating from a new balancing reservoir located near 17°14′43″N 81°27′57″E in Eastern Ghats area, will be connected to the Polavaram reservoir with a fore shore pump house to lift the water by 150 meters to feed in to a Fifteen (15) km long tunnel across the Eastern Ghats. The balancing reservoir would also serve as the upper pond for using the pumping station as peaking hydro power station.

Posted

yes man polavarm ki link ayyi inka konni projects vunay link of of all the rivers in india $120 billion project 

*=:

×
×
  • Create New...