TS GENCO has an installed power generating capacity of about 4,364 MW and has technical capability in the area of installing, owning, operating as well as maintaining power plants, the release said. BHEL has already executed thermal power projects in Telangana in Bhupalapally, Singareni Colleries and Kothagudem, whose performance is above the national average in terms of plant load factor, the release said. The Chief Minister reposed faith and confidence in BHEL, which would execute the project as the nominated engineering procurement and construction (EPC) contractor within three years, the release added.

 

PK.gif

 

 

ok....let see about faith in EPC after 3 years.

 

PK.gif

Posted

ok....let see about faith in EPC after 3 years.

 

PK.gif

neeku endhuku doubt uncle 

Posted

ok....let see about faith in EPC after 3 years.

 

PK.gif

 

Why this crying.. manchi pani jarguthe appreciate cheyakapothe ela bro..PK.gif

Posted

Why this crying.. manchi pani jarguthe appreciate cheyakapothe ela bro..PK.gif

crying kadhu kani 3 yrs lo 6000MW doesnt sound realisitc.... but depends on how hard the govt presses BHEL and how efficiently BHEL can get this done.... 

 

5 years sounds more realistic to me....

 

I worked in a EPC company for about 3 years including my internship so I know how things work... India lo kabatti inkonchem slow avthai ani assumption.... 

 

whatever be the time frame mothaniki pani aithe chalu kaastha atu itu ga

Posted

TDP Fb page analysts

 

akkada analysis ante adhi nikharsaiana nijam bemmiRTlaugh.gif

Posted

crying kadhu kani 3 yrs lo 6000MW doesnt sound realisitc.... but depends on how hard the govt presses BHEL and how efficiently BHEL can get this done.... 

 

5 years sounds more realistic to me....

 

I worked in a EPC company for about 3 years including my internship so I know how things work... India lo kabatti inkonchem slow avthai ani assumption.... 

 

whatever be the time frame mothaniki pani aithe chalu kaastha atu itu ga

6000 oke sari start cheyakapovachu phases antu undi untay ga and BHEl antha pedha company ki planning lekunda undi untay antava

Posted

on an other note.. BHEL can supply all the equipment including turbines so process can be quicker instead of depending on other manufacturing companies.... all in all it boils down to how serious they are

Posted

crying kadhu kani 3 yrs lo 6000MW doesnt sound realisitc.... but depends on how hard the govt presses BHEL and how efficiently BHEL can get this done.... 

 

5 years sounds more realistic to me....

 

I worked in a EPC company for about 3 years including my internship so I know how things work... India lo kabatti inkonchem slow avthai ani assumption.... 

 

whatever be the time frame mothaniki pani aithe chalu kaastha atu itu ga

 

Hope So.. but its an open secret.. Unless there is power surplus.. KTR KCR brand hyderabad ni entha promote chesina no use.. So I am sure they will follow a strict timeline and get this done..

Posted

akkada analysis ante adhi nikharsaiana nijam bemmiRTlaugh.gif

@gr33d

Posted

on an other note.. BHEL can supply all the equipment including turbines so process can be quicker instead of depending on other manufacturing companies.... all in all it boils down to how serious they are

advisor ga join avvachuga vallaki  bye1

Posted

6000 oke sari start cheyakapovachu phases antu undi untay ga and BHEl antha pedha company ki planning lekunda undi untay antava

planning problem kadhu... as I said govt pressing batti untundhi.... private company aina L&T deal chesthunna metro choosthunnam kada.... evo oka addankulu tho delay avthundhi.... 

Posted

Hope So.. but its an open secret.. Unless there is power surplus.. KTR KCR brand hyderabad ni entha promote chesina no use.. So I am sure they will follow a strict timeline and get this done..

yes they should... electricity is definitely a pressing issue....

×
×