Jump to content

First Unit Of Hinduja Power’S Vizag Plant To Go On Stream By December


Recommended Posts

Posted

Hinduja National Power Corporation Limited is set to commission its first 520 MW unit of the 1,040 MW thermal power project located at Palavalasa, near Visakhapatnam in Andhra Pradesh by December.

Thereafter, the second unit of 520 MW will be ready to go on stream by January-February 2015

The company has a long-term coal supply arrangement with Mahanadi Coalfields Ltd. Hinduja 

With the project securing a fresh nod, the State discoms signed a Continuation Agreement in 2013 for renewal of the power purchase agreement. The power generated was to be supplied to AP discoms. 

Posted

indulo TS share unda banthi.gif?1290055643

asalu PPA ne ledu.. apude share how ya how..?

Posted

asalu PPA ne ledu.. apude share how ya how..?

talibans ki cheppu, vintaaremo chuddam TskVKdY.gif

Posted

who is he..? ee constituency..?

kinda literal ga rape chesaru

armoor howle TskVKdY.gif

 

Posted

who is he..? ee constituency..?

kinda literal ga rape chesaru

jeevan reddy...trs mla...armoor constituency...armoor lo antha howles untaru...kaavali ante check chesuko..oka dhed armoor dbian undevaadu...now missing TskVKdY.gif

Posted

@cc  @cc

jeevan reddy...trs mla...armoor constituency...armoor lo antha howles untaru...kaavali ante check chesuko..oka dhed armoor dbian undevaadu...now missing TskVKdY.gif

 

×
×
  • Create New...