no probelms for ap with respect to power 

pvt power plants chala vastunayi krishna patnam lo ellathi 

 

solar dhi kuda govt encourage chesthundhi 
 

krishna patnam lo rleaince enka central govt kalisi 4000mw ultra power plant okasti start avthundhi,srikakulam lo nuclear power plant okati vasthundhi,polavaram power plant okati vachidhi ,NTPC vadu 4000mw additional cacity add chesthunadu simhadri power plant lo evi anni ravataniki time pattina probem aithe radu 

 

 

i feel proud that our nellore is contributing to our state development

  • Replies 55
  • Created
  • Last Reply

Top Posters In This Topic

  • Aston08

    18

  • Gajji_maraja

    9

  • killer99

    9

  • powerstar02

    4

Popular Days

Top Posters In This Topic

Posted

can anyone tell what is the present capacity of tg power generation and what is the required power to consume in tg??

Posted

can anyone tell what is the present capacity of tg power generation and what is the required power to consume in tg??

 

their production is around 4500 mw but they need more than 6500 mw

Posted

can anyone tell what is the present capacity of tg power generation and what is the required power to consume in tg??


Adhi teliyadhu kani tallest tower Matram vastundhi :d
Posted

can anyone tell what is the present capacity of tg power generation and what is the required power to consume in tg??

 

4385MW actual installed capacity... (thermal and hydro kalipi)

 

losses and maintainence kinda 40% cut cheksunte..approximate 2000MW chillar generate avutadi..

 

andulo  Hyderabad ki major share..and konni vere states distribution lo veltadi..central govt quota kinda

 

approximate TG ki vachedi 1500MW required is somewhere around 2500MW for 24/7 supply

Posted

baaga cheeki meppinchi rapinchuntadu...cheekadam lo nakka leru poti nakka ki nakke saati

Posted

their production is around 4500 mw but they need more than 6500 mw

present requirement ye 6500mw ante inka metro start avane ledu...and more investments yet to come in hyd...chattisgarh help chesina tg problems solve avavu kada coming 5 years lo...tg going back to dark ages na...

Posted

their production is around 4500 mw but they need more than 6500 mw

 

+1 and kcr gadu next 4 months lo power ni manage cheyalekapothe summer lo vuntadi....ipati situation kanna ghoram ga vuntadi apudu if he cant manage to bring power

Posted

present requirement ye 6500mw ante inka metro start avane ledu...and more investments yet to come in hyd...chattisgarh help chesina tg problems solve avavu kada coming 5 years lo...tg going back to dark ages na...

 

 

+1 and kcr gadu next 4 months lo power ni manage cheyalekapothe summer lo vuntadi....ipati situation kanna ghoram ga vuntadi apudu if he cant manage to bring power

 

in a way kcr gadu cm ayyi bakra ayyadu. maata meedha nilabadi ey bc no cm chesi undi untey vadi koduku ki anna aa name panikochedhi. andhukey vadiki vision ledhu anedhi. firstly, bifurication ey loss. andhulo veedi thingari thanam vedini malli edhavani chesindhi

Posted

present requirement ye 6500mw ante inka metro start avane ledu...and more investments yet to come in hyd...chattisgarh help chesina tg problems solve avavu kada coming 5 years lo...tg going back to dark ages na...


MOUs sign inay ga 10k MW ki lol
Posted

in a way kcr gadu cm ayyi bakra ayyadu. maata meedha nilabadi ey bc no cm chesi undi untey vadi koduku ki anna aa name panikochedhi. andhukey vadiki vision ledhu anedhi. firstly, bifurication ey loss. andhulo veedi thingari thanam vedini malli edhavani chesindhi


Apude emindhi mundhu vundhi asalina festival
Posted

MOUs sign inay ga 10k MW ki lol

aa power plant capacity 10k MW undadu...if at all fine with rate matters...they can share almost 2000 MW only(i think)...

Posted

in a way kcr gadu cm ayyi bakra ayyadu. maata meedha nilabadi ey bc no cm chesi undi untey vadi koduku ki anna aa name panikochedhi. andhukey vadiki vision ledhu anedhi. firstly, bifurication ey loss. andhulo veedi thingari thanam vedini malli edhavani chesindhi

bifurcation ki congress antha rigid ga untundi ani vadu kuda anukoledu...but congress vani plan tippi kottindi...ika mundu vaniki crocodile festival ye..

Posted

aa power plant capacity 10k MW undadu...if at all fine with rate matters...they can share almost 2000 MW only(i think)...


Cheekay ravi Esina posts lo alage vundhi Mari brahmi%20laugh_01.gif
Posted

Apude emindhi mundhu vundhi asalina festival

 

 

bifurcation ki congress antha rigid ga untundi ani vadu kuda anukoledu...but congress vani plan tippi kottindi...ika mundu vaniki crocodile festival ye..

 

agreed about the festivals. ee sari bathukamaku veedini ooregistharu emo

×
×