Jump to content

Ap Prabuthvam Power Estamu Anna Memu Tesukom


Recommended Posts

  • Replies 49
  • Created
  • Last Reply

Top Posters In This Topic

  • thedarkknight

    10

  • pythonic

    8

  • athletics

    5

  • GajjiGaru_

    5

Top Posters In This Topic

Posted

Meanwhile TS got 197MU from AP from it s total consumption of 1182 MU units over last 9 days

 

B_vf7J_VEAALfDY.jpg

Posted

malli summer lo power cuts ragane as usual cry sestadu edu gallery_8818_6_385253.gif?1367349476

Posted

malli summer lo power cuts ragane as usual cry sestadu edu gallery_8818_6_385253.gif?1367349476

gallery_8818_6_385253.gif?1367349476

Posted

 

 

Continuation of PPAs with APGenco may prove costly for Telangana   From next year, State will have to pay Rs. 7.26 per unit for 246 MUs to be availed from AP

The Telangana State could be fouling its own nest by fighting for its share from the APGenco’s projects. The State’s discoms will stand to lose in the long run if the existing PPAs with APGenco are allowed to continue beyond certain period, warns the People’s Monitoring Group on Electricity Regulation (PMGER).

Speaking at a workshop conducted by the group ahead of the TSERC public hearings on tariff proposals, K. Raghu, the group’s member and TEEJAC Coordinator, cautioned that power purchases from AP will prove to be very expensive, especially from the Damodaram Sanjeevaiah Thermal Power Station at Krishnapatnam and the upcoming Unit IV of the Rayalaseema Thermal Power Project (RTPP) in Kadapa district.

In contrast, power from Telangana’s Kakatiya Thermal Power Project at Warangal and Singareni Collieries project coming up at Adilabad will be relatively cheaper. The two projects together will contribute 1,800 MW to the grid, of which, if the PPAs are retained, 46.11 per cent will be apportioned to AP discoms.

Fixed costs for RTPP Unit III are the highest at Rs.3.54 per unit, and for the fourth unit, they will escalate further. From next year, Telangana will end up paying net cost of Rs. 7.26 per unit for the 246 million units to be availed from AP.

Further, capital cost for the Krishnapatnam project, he alleged, has exceeded the estimates by 60 per cent, from Rs.5 crore to Rs.8 crore per MW.

“Variable cost too would be high as the project uses imported coal. Telangana could do well by sparing its citizens of the burden,” Mr. Raghu pointed.

With PPAs cancelled, however, the government will be constrained to plan meticulously for one year so that agriculture does not suffer. What AP effectively supplies now is only 370 MW, and the situation will definitely ease out in the next two to three years, with the opening up of North-South corridor, and completion of KTPS Unit VII.

“In lieu of the cancellation of PPAs, the government should demand 500 MW of additional power from either AP or central pool for the next two years for the common capital,” he said.

If the central committee decides to let the PPAs continue, that will be the last nail in the coffin, Mr. Raghu warned.

M. Kodanda Reddy from the Telangana State Kisan Congress, who spoke at the meeting, pointed out that installation of ISI pump-sets as suggested by discoms is proving to be costly for farmers as the bad quality of power supplied is burning them.

 

Power from Telangana’s Kakatiya thermal project and Singareni Collieries project coming up in Adilabad will be relatively cheaper

 

http://www.thehindu.com/news/national/telangana/continuation-of-ppas-with-apgenco-may-prove-costly-for-telangana/article6968391.ece

Posted

malli summer lo power cuts ragane as usual cry sestadu edu gallery_8818_6_385253.gif?1367349476

LoL.1q

Posted

“In lieu of the cancellation of PPAs, the government should demand 500 MW of additional power from either AP or central pool for the next two years for the common capital,” he said.

 

 

Migitha vallu erri pappalu veelu smart mari...ayina eppudo PPAs cancelled gaa inka racha endi...

Posted

kaktiya power plant second phase 600w watts eppatiki ayipothundhi emanna idea undha jsut 500mw/600mw  plant adhi 

 

danni vadhileyi adilabad lo pwer paltn eppudu ayyipothundhi asala 

 

strt ayinda work 

 

a power plants work avthunte anukovachu power koantam apestamu ani

 

almost 1/6th of power AP nundi tesukuni malli allu estam anna maku power voddu anatam lo logic enti

Posted

kaktiya power plant second phase 600w watts eppatiki ayipothundhi emanna idea undhi

 

danni vadhileyi adilabad lo pwer paltn eppudu ayyipothundhi asala 

 

strt ayinda work 

 

a power plants work avthunte anukovachu power koantam apestamu ani

 

almost 1/6th of power AP nundi tesukuni malli allu estam anna maku power voddu anatam lo logic enti

Aa adilabad dhi monne inaugurate chesadu...Inka additional isthe vaddu antamu ani emo eppudu isthnadhi kadu...wait for summer...malla racha start gallery_8818_6_385253.gif?1367349476

Posted

kaktiya power plant second phase 600w watts eppatiki ayipothundhi emanna idea undha jsut 500mw/600mw  plant adhi 

 

danni vadhileyi adilabad lo pwer paltn eppudu ayyipothundhi asala 

 

strt ayinda work 

 

a power plants work avthunte anukovachu power koantam apestamu ani

 

almost 1/6th of power AP nundi tesukuni malli allu estam anna maku power voddu anatam lo logic enti

 

Bhoopalapally (600 MW), Singareni-Jaipur (1,200 MW) and KTPS (800 MW) are projected to start production before October 2016.

 

Kakatiya phase 3 is going at a very fast pace. KCR anta confident ga cheptunnadu ante matter unda batte kada leka pote G mosukoni

 

kurchuntadu

 

enka 1/6 is projected but TS is getting only 370 MU from AP

Posted

Aa adilabad dhi monne inaugurate chesadu...Inka additional isthe vaddu antamu ani emo eppudu isthnadhi kadu...wait for summer...malla racha start gallery_8818_6_385253.gif?1367349476

 

monna start chesindi 3rd phase (600MU), 1st phase already is incontruction (2x600MU) and it will start producing 600MU from november this year

Posted

Bhoopalapally (600 MW), Singareni-Jaipur (1,200 MW) and KTPS (800 MW) are projected to start production before October 2016.

 

Kakatiya phase 3 is going at a very fast pace. KCR anta confident ga cheptunnadu ante matter unda batte kada leka pote G mosukoni

 

kurchuntadu

 

enka 1/6 is projected but TS is getting only 370 MU from AP

 

KCR matalni namadam kashtam bro. 

 

plate phirainchadam bagha alavatu asaley

×
×
  • Create New...