Jump to content

Ap Prabuthvam Power Estamu Anna Memu Tesukom


Recommended Posts

Posted

monna start chesindi 3rd phase (600MU), 1st phase already is incontruction (2x600MU) and it will start producing 600MU from november this year

Ok...MW annukunta not MU...ayithe konchem edupu taggudhi ayithe...

  • Replies 49
  • Created
  • Last Reply

Top Posters In This Topic

  • thedarkknight

    10

  • pythonic

    8

  • athletics

    5

  • GajjiGaru_

    5

Top Posters In This Topic

Posted

monna start chesindi 3rd phase (600MU), 1st phase already is incontruction (2x600MU) and it will start producing 600MU from november this year

 

 

ivi state govt projects aa leka central govt aa?

 

monna budget lo appropriate amount allocate cheyaledhu annaru kadha?? did they reconsider it??

Posted

Bhoopalapally (600 MW), Singareni-Jaipur (1,200 MW) and KTPS (800 MW) are projected to start production before October 2016.

 

Kakatiya phase 3 is going at a very fast pace. KCR anta confident ga cheptunnadu ante matter unda batte kada leka pote G mosukoni

 

kurchuntadu

 

enka 1/6 is projected but TS is getting only 370 MU from AP

Bhoopalapally ante kakatiya plant e ga

 

e power plant phase 3  eppudu strt chesaru 

 

KTPS Enka time atidhi anukunta 

 

sare chudam 

 

oct 2016 lopala complete ayyavatiki eppatnundi tho kottam endhuku kcr 

 

paina post chesina stats chudu south india mothaniki grid ki sambandinchi navi avi 

 

i will post the link if i get it 370 MU ekkada figure adhi montha ka 

Posted

Ok...MW annukunta not MU...ayithe konchem edupu taggudhi ayithe...


Mu is million units of power,1 Mu = 1000000 kwh
Posted

Ok...MW annukunta not MU...ayithe konchem edupu taggudhi ayithe...

MW anne mega watt

 

Mu ante million units bhayya 

 

oka watt current on one hr vadithe oka unit anataru 

 

so uasge ni units lo measure chesthadu

 

plant capaicity MW lo chestahru 

Posted

ivi state govt projects aa leka central govt aa?

 

monna budget lo appropriate amount allocate cheyaledhu annaru kadha?? did they reconsider it??

avi anni entah ka mundhe strt chesinave ie before state formation

Posted

kaktiya power plant second phase 600w watts eppatiki ayipothundhi emanna idea undha jsut 500mw/600mw  plant adhi 

 

danni vadhileyi adilabad lo pwer paltn eppudu ayyipothundhi asala 

 

strt ayinda work 

 

a power plants work avthunte anukovachu power koantam apestamu ani

 

almost 1/6th of power AP nundi tesukuni malli allu estam anna maku power voddu anatam lo logic enti

ee November ki finish avutadi adhi. 1200 MW

Posted

Aa adilabad dhi monne inaugurate chesadu...Inka additional isthe vaddu antamu ani emo eppudu isthnadhi kadu...wait for summer...malla racha start gallery_8818_6_385253.gif?1367349476

Monna inaguarate chesindi extra 600MW kosam. 1200 MW vi ee November nundi start avutaay

Posted

ivi state govt projects aa leka central govt aa?

 

monna budget lo appropriate amount allocate cheyaledhu annaru kadha?? did they reconsider it??

adilabad 1200 MW Jaipur plant Singareni dhi.

Posted

AP ki Power star unnadu kada.. Power problem em undadu. TG ki kastame :P

 

Pun intended!

Posted

ee November ki finish avutadi adhi. 1200 MW

k nenu kothadi anukunna my mistake 

Posted

AP ki Power star unnadu kada.. Power problem em undadu. TG ki kastame :P

 

Pun intended!

power star stays in TS 

Posted

“In lieu of the cancellation of PPAs, the government should demand 500 MW of additional power from either AP or central pool for the next two years for the common capital,” he said.

 

 

Migitha vallu erri pappalu veelu smart mari...ayina eppudo PPAs cancelled gaa inka racha endi...

u mean Mana Crying bathc president CK RAvi gallery_8818_6_734716.gif

Posted

Monna inaguarate chesindi extra 600MW kosam. 1200 MW vi ee November nundi start avutaay

Ok...got it uncle...

Posted

u mean Mana Crying bathc president CK RAvi gallery_8818_6_734716.gif

aa article cheppina vadu...demand anta..anni valla mattale...eduthi vadiki inka option ivvara enti gallery_8818_6_734716.gif

×
×
  • Create New...