pythonic Posted March 10, 2015 Report Posted March 10, 2015 monna start chesindi 3rd phase (600MU), 1st phase already is incontruction (2x600MU) and it will start producing 600MU from november this year Ok...MW annukunta not MU...ayithe konchem edupu taggudhi ayithe...
killer99 Posted March 10, 2015 Report Posted March 10, 2015 monna start chesindi 3rd phase (600MU), 1st phase already is incontruction (2x600MU) and it will start producing 600MU from november this year ivi state govt projects aa leka central govt aa? monna budget lo appropriate amount allocate cheyaledhu annaru kadha?? did they reconsider it??
thedarkknight Posted March 10, 2015 Author Report Posted March 10, 2015 Bhoopalapally (600 MW), Singareni-Jaipur (1,200 MW) and KTPS (800 MW) are projected to start production before October 2016. Kakatiya phase 3 is going at a very fast pace. KCR anta confident ga cheptunnadu ante matter unda batte kada leka pote G mosukoni kurchuntadu enka 1/6 is projected but TS is getting only 370 MU from AP Bhoopalapally ante kakatiya plant e ga e power plant phase 3 eppudu strt chesaru KTPS Enka time atidhi anukunta sare chudam oct 2016 lopala complete ayyavatiki eppatnundi tho kottam endhuku kcr paina post chesina stats chudu south india mothaniki grid ki sambandinchi navi avi i will post the link if i get it 370 MU ekkada figure adhi montha ka
athletics Posted March 10, 2015 Report Posted March 10, 2015 Ok...MW annukunta not MU...ayithe konchem edupu taggudhi ayithe... Mu is million units of power,1 Mu = 1000000 kwh
thedarkknight Posted March 10, 2015 Author Report Posted March 10, 2015 Ok...MW annukunta not MU...ayithe konchem edupu taggudhi ayithe... MW anne mega watt Mu ante million units bhayya oka watt current on one hr vadithe oka unit anataru so uasge ni units lo measure chesthadu plant capaicity MW lo chestahru
thedarkknight Posted March 10, 2015 Author Report Posted March 10, 2015 ivi state govt projects aa leka central govt aa? monna budget lo appropriate amount allocate cheyaledhu annaru kadha?? did they reconsider it?? avi anni entah ka mundhe strt chesinave ie before state formation
dalapathi Posted March 10, 2015 Report Posted March 10, 2015 kaktiya power plant second phase 600w watts eppatiki ayipothundhi emanna idea undha jsut 500mw/600mw plant adhi danni vadhileyi adilabad lo pwer paltn eppudu ayyipothundhi asala strt ayinda work a power plants work avthunte anukovachu power koantam apestamu ani almost 1/6th of power AP nundi tesukuni malli allu estam anna maku power voddu anatam lo logic enti ee November ki finish avutadi adhi. 1200 MW
dalapathi Posted March 10, 2015 Report Posted March 10, 2015 Aa adilabad dhi monne inaugurate chesadu...Inka additional isthe vaddu antamu ani emo eppudu isthnadhi kadu...wait for summer...malla racha start Monna inaguarate chesindi extra 600MW kosam. 1200 MW vi ee November nundi start avutaay
dalapathi Posted March 10, 2015 Report Posted March 10, 2015 ivi state govt projects aa leka central govt aa? monna budget lo appropriate amount allocate cheyaledhu annaru kadha?? did they reconsider it?? adilabad 1200 MW Jaipur plant Singareni dhi.
JasonBourne13 Posted March 10, 2015 Report Posted March 10, 2015 AP ki Power star unnadu kada.. Power problem em undadu. TG ki kastame :P Pun intended!
thedarkknight Posted March 10, 2015 Author Report Posted March 10, 2015 ee November ki finish avutadi adhi. 1200 MW k nenu kothadi anukunna my mistake
thedarkknight Posted March 10, 2015 Author Report Posted March 10, 2015 AP ki Power star unnadu kada.. Power problem em undadu. TG ki kastame :P Pun intended! power star stays in TS
SeelamleniAunty Posted March 10, 2015 Report Posted March 10, 2015 “In lieu of the cancellation of PPAs, the government should demand 500 MW of additional power from either AP or central pool for the next two years for the common capital,” he said. Migitha vallu erri pappalu veelu smart mari...ayina eppudo PPAs cancelled gaa inka racha endi... u mean Mana Crying bathc president CK RAvi
pythonic Posted March 10, 2015 Report Posted March 10, 2015 Monna inaguarate chesindi extra 600MW kosam. 1200 MW vi ee November nundi start avutaay Ok...got it uncle...
pythonic Posted March 10, 2015 Report Posted March 10, 2015 u mean Mana Crying bathc president CK RAvi aa article cheppina vadu...demand anta..anni valla mattale...eduthi vadiki inka option ivvara enti