neellallo digi pasuspu yesi celebrations chesthunte santhoshincha endi vayya maree too much failure idi okka motor ke thattukolekapoindi

 

dabbulu jebulo eskodam maani honest gaa chesunte bagundedi

dabbulo jeblu vesukovaddu ante ela boss....mundu prabhutvaalu tinnai..memu tintaam. asalu avineeti cheyakunda panulu cheyadaniki paina nundi oodi paddama memu? nuvvu mari maatladutav.

avakasam unnapude sadviniyogam cheskovali.

Posted

neellallo digi pasuspu yesi celebrations chesthunte santhoshincha endi vayya maree too much failure idi okka motor ke thattukolekapoindi

dabbulu jebulo eskodam maani honest gaa chesunte bagundedi

avnu baa....total project waste money waste...1300crs waste :(
Posted

100 crores kooda sarigga sanction kaledhu Ee project ki..

Aina canal work poorthayindhi..

Koolipoyindhi temporary wall..


Maa compound wall em kadu? Malli great wall of china kattinanta publicity..
Posted

Anta tondara enduku man....Janala dabbul a kada waste iyyindi..appudeppudo YSR gadu Ponnala gadu eddaru..potireddipadu o..inka edo project same itlaney gandi paditey...criticze chesar..why not now?

Posted

idi pattisema leka polavaram right canal aa???

Posted

#pulkaslogic

Backlog grooming lo prioritize chesi next sprint thappaka fix chestharu ani gopimama cheppamannadu
Posted

Pollavaram ani vundi meeeu patteseema ani quarrelling

polavaram right canal use chese pattiseema lift irrigation project finish chesaru...
Posted

idi pattisema leka polavaram right canal aa???

basically pattiseema is the make shift project in place of polavaram..i.elifting of water from godavari and connecting to Krishna delta via polavaram right canal..the whole polavaram project which was identified as a national projext would cost upwards of 30k+ crores and has major ecological environment hurdles to overcome since it would cause submergence of nearly 7 mandals owing to a dam and then lift water from there, in the interim as a eye wash what they have done is done fitted some mototrs in godavari to lift water and transfer via canal built for polvaram at a cost of 1300 crores.

So problem is identified in polavaram right canal used for pattiseema
Posted

water grid project kuda same contractor so pinkies ekkuva chinchukovadhu CITI_c$y CITI_c$y

Posted

water grid project kuda same contractor so pinkies ekkuva chinchukovadhu CITI_c$y CITI_c$y

Yes, but the problem lies with administration for being pushy and raced ahead of time, didn't even give the time for the construction to heal properly.

An excerpt from a news article

To the utter shock of the engineers and ruling TDP leaders, the aqueduct constructed on Tammileru river stream near Janampet village witnessed breaches within hours after water began gushing into the canal from the lift irrigation scheme. After the efforts of the officials to arrest the breach failed, they finally switched off the motor to reduce the water flow. The aqueduct was constructed at a cost of Rs 15 crore. Interestingly, the engineers claimed that the aqueduct work was completed in a record time of 30 days as the entire concrete work, which started in July, was finished by August. We have been suspecting the danger as we were not allowed to work as per the rule book. The breach is the result of completing the work without giving proper time for curing," said an engineer of water resources department. He alleged that the senior officials, including the district collectors, warned us to complete the work ahead of the schedules without following due process of engineering only to score some brownie points with the CM.

Engineering officials said that the situation could have been more serious had other motors too been installed as per the plan. As per the original design, the contractor had to install 24 motors each to pump about 8,500 cusecs in all to take flood waters from Godavari to Krishna through Polavaram right main canal. With the Naidu government insisting to be the first to link the rivers as part of National River Linking Scheme, the officials raced ahead of time and rolled out the project with half or partially-dug canal work. The engineers could finish the digging of canal just for about 20 metres width against the original design of 80 metres width along 174 km long canal.

The engineers were also forced to construct make-shift aqueducts and under-tunnel bridges in order to reach the deadlines fixed the government. Upon information, West Godavari district collector Katamaneni Bhaskar and Dendulur legislator Chintamaneni Prabhakar visited the breach site late on Saturday night and reviewed the situation with the engineers. With flood waters gushing from upstream, the officials decided not to operate the pump so early
Posted

water grid project kuda same contractor so pinkies ekkuva chinchukovadhu CITI_c$y CITI_c$y

appudu androlla kutra ante saripoddi ga CITI_c$y CITI_c$y
Posted

Yes, but the problem lies with administration for being pushy and raced ahead of time, didn't even give the time for the construction to heal properly.

An excerpt from a news article

To the utter shock of the engineers and ruling TDP leaders, the aqueduct constructed on Tammileru river stream near Janampet village witnessed breaches within hours after water began gushing into the canal from the lift irrigation scheme. After the efforts of the officials to arrest the breach failed, they finally switched off the motor to reduce the water flow. The aqueduct was constructed at a cost of Rs 15 crore. Interestingly, the engineers claimed that the aqueduct work was completed in a record time of 30 days as the entire concrete work, which started in July, was finished by August. We have been suspecting the danger as we were not allowed to work as per the rule book. The breach is the result of completing the work without giving proper time for curing," said an engineer of water resources department. He alleged that the senior officials, including the district collectors, warned us to complete the work ahead of the schedules without following due process of engineering only to score some brownie points with the CM.

Engineering officials said that the situation could have been more serious had other motors too been installed as per the plan. As per the original design, the contractor had to install 24 motors each to pump about 8,500 cusecs in all to take flood waters from Godavari to Krishna through Polavaram right main canal. With the Naidu government insisting to be the first to link the rivers as part of National River Linking Scheme, the officials raced ahead of time and rolled out the project with half or partially-dug canal work. The engineers could finish the digging of canal just for about 20 metres width against the original design of 80 metres width along 174 km long canal.

The engineers were also forced to construct make-shift aqueducts and under-tunnel bridges in order to reach the deadlines fixed the government. Upon information, West Godavari district collector Katamaneni Bhaskar and Dendulur legislator Chintamaneni Prabhakar visited the breach site late on Saturday night and reviewed the situation with the engineers. With flood waters gushing from upstream, the officials decided not to operate the pump so early