Jump to content

Polavaram Project design & Implementation


Recommended Posts

Posted
5 minutes ago, TampaChinnodu said:

Sincere question. First terms lo em sesadu CBN polavaram ki , Why there was no movement in the project till YSR started it again ?

his priorities were different... he concentrated more on hyderabad and IT

  • Replies 78
  • Created
  • Last Reply

Top Posters In This Topic

  • DiscoKing

    35

  • TampaChinnodu

    7

  • Annayya_fan

    5

  • dakumangalsingh

    4

Top Posters In This Topic

Posted
2 minutes ago, pahelwan said:

Thank you kcr and people of telangana. If there was no telangana agitation there would have been no polavaram. 

chaa 

Posted

mahametha never had discusion on polavaram dam engineering... kanisam eppudu national(forget international) level experts tho kuda basic minimum study kuda cheyinchala....

entha sepu kalavalu tavvi(where no bridges&aqueducts are required) edho pekesinatu build up ichadu..

When CBN came to power in 2014 then 1st asked for feasibility study.... daani Outcome ee new design in rockfilldam of 150m(by Germans&Australian suggestion) depth and now Coffer Dam

 

Posted
23 minutes ago, pahelwan said:

Thank you kcr and people of telangana. If there was no telangana agitation there would have been no polavaram. 

kachara bhajana f02d6a0b05.gif

Posted
2 hours ago, DiscoKing said:

Huge project... idhi complete ithe modern day cotton dora avutadu CBN :) 

murali mohana and cbn entha nokkuthunnaru enti project la.. the way they looted HYD farmers near Hitech city. @3$%

Posted
1 hour ago, DiscoKing said:

mahametha never had discusion on polavaram dam engineering... kanisam eppudu national(forget international) level experts tho kuda basic minimum study kuda cheyinchala....

entha sepu kalavalu tavvi(where no bridges&aqueducts are required) edho pekesinatu build up ichadu..

When CBN came to power in 2014 then 1st asked for feasibility study.... daani Outcome ee new design in rockfilldam of 150m(by Germans&Australian suggestion) depth and now Coffer Dam

 

feasibility study by muralo mohan to see how much can be looted here.@3$%

Posted
1 hour ago, TampaChinnodu said:

Stop pure CBN Bhajana. Credit to YSR for bringing dead project to life. And credit to CBN for continuing it. 

 

yellow in the cammode bhajana f02d6a0b05.gif

Posted
1 hour ago, DiscoKing said:

chaa 

Lekunte bongu vastunde polavaram ki clearance. Lathkor cbn gadu enni janmalu ethina vachedi kadu. Appudu Central la bjp state la tdp unappduu athulu pikinda clearance enduku techukoledu. Just to pacify andhra people congress declared it national project during state bifurcation lekunte matta bi vachedi kadu. Thanks to kcr and people of telangana again. 

Posted
1 hour ago, Annayya_fan said:

kachara bhajana f02d6a0b05.gif

Nidi chichora bajana 

Posted
10 minutes ago, SSTNKM said:

murali mohana and cbn entha nokkuthunnaru enti project la.. the way they looted HYD farmers near Hitech city. @3$%

mana saati reddy gariki ee sariki nokke chance ledani thega feel itunnattu unnav f02d6a0b05.gif

Posted
2 minutes ago, pahelwan said:

Nidi chichora bajana 

nope...cbn bhajana f02d6a0b05.gif

Posted
7 minutes ago, pahelwan said:

Lekunte bongu vastunde polavaram ki clearance. Lathkor cbn gadu enni janmalu ethina vachedi kadu. Appudu Central la bjp state la tdp unappduu athulu pikinda clearance enduku techukoledu. Just to pacify andhra people congress declared it national project during state bifurcation lekunte matta bi vachedi kadu. Thanks to kcr and people of telangana again. 

hyderavada aathulu pekadu lee ipudu manam ave fry noodle chesukoni tintunam 

Posted
15 minutes ago, SSTNKM said:

feasibility study by muralo mohan to see how much can be looted here.@3$%

piece piece  gadu m0dda kooda eekalekapoyadu MM ni mee shiitt patrika lo fake stories ayatam tappa no use  @3$% 

Posted
18 minutes ago, SSTNKM said:

murali mohana and cbn entha nokkuthunnaru enti project la.. the way they looted HYD farmers near Hitech city. @3$%

Jagan fans thinking @3$% 

Posted
1 hour ago, DiscoKing said:

mahametha never had discusion on polavaram dam engineering... kanisam eppudu national(forget international) level experts tho kuda basic minimum study kuda cheyinchala....

entha sepu kalavalu tavvi(where no bridges&aqueducts are required) edho pekesinatu build up ichadu..

When CBN came to power in 2014 then 1st asked for feasibility study.... daani Outcome ee new design in rockfilldam of 150m(by Germans&Australian suggestion) depth and now Coffer Dam

 

for polavaram project, Site clearance was obtained from the Centre on 19 September 2005, environmental clearance on 25 October 2005, R & R clearance on 17 April 2007, wildlife sanctuary clearance on 19 Sept 2008, forest clearance on 26 Dec 26 2008 and technical advisory committee clearance on 20 January 2009. Progress of polavaram hit road block post YSR death.[20] later,

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...