Teluguvadu8888 Posted March 9, 2018 Report Posted March 9, 2018 2 hours ago, Pitta said: Adigadigo amaravathi ani CBN chepthunte AP janala reaction Quote
Pitta Posted March 9, 2018 Report Posted March 9, 2018 11 hours ago, Teluguvadu8888 said: Adigadigo amaravathi ani CBN chepthunte AP janala reaction lol Quote
Bitcoin_Baba Posted March 9, 2018 Report Posted March 9, 2018 11 hours ago, Teluguvadu8888 said: Adigadigo amaravathi ani CBN chepthunte AP janala reaction nee yavva Quote
Kool_SRG Posted March 9, 2018 Report Posted March 9, 2018 11 hours ago, Teluguvadu8888 said: Adigadigo amaravathi ani CBN chepthunte AP janala reaction Quote
Teluguvadu8888 Posted March 9, 2018 Report Posted March 9, 2018 13 hours ago, Teluguvadu8888 said: Adigadigo amaravathi ani CBN chepthunte AP janala reaction CBN and @psycopk Quote
Navyandhra Posted March 12, 2018 Author Report Posted March 12, 2018 పోలవరం ప్రాజెక్టు తాజా స్థితి : ఇప్పటివరకు పోలవరం ప్రాజెక్టు 54.4% పూర్తి కుడి ప్రధాన కాలువ 91% పూర్తి ఎడమ ప్రధాన కాలువ 59.6% పూర్తి హెడ్ వర్క్స్ 41.2% పూర్తి మొత్తం తవ్వకం పనులు 70% పూర్తి (1115.59 లక్షల క్యూబిక్ మీటర్లకు గాను 778.80 లక్షల క్యూబిక్ మీటర్ల మేర తవ్వకం పనులు పూర్తయ్యాయి) స్పిల్ వే, స్పిల్ చానల్ కాంక్రీట్ పనులు 16% పూర్తి డయాఫ్రమ్ వాల్ 72% పూర్తి రేడియల్ గేట్ల ఫ్యాబ్రికేషన్ 58% పూర్తి స్పిల్వే, ఈసీఆర్ఎఫ్ డ్యామ్, గేట్లకు సంబంధించి మొత్తం 42 డిజైన్లకు గాను ఇప్పటివరకు 14 డిజైన్లను సీడబ్ల్యూసీ ఆమోదించింది, మరో 16 డిజైన్లను సమర్పించడం జరిగింది. గడిచిన వారం రోజుల్లో పురోగతి వివరాలు : లక్షా 26 వేల క్యూబిక్ మీటర్ల తవ్వకం పనులు జరిగాయి 17 వేల క్యూబిక్ మీటర్ల వరకు కాంక్రీట్ పనులు పూర్తయ్యాయి డయాఫ్రమ్ వాల్ 18.8 మీటర్ల వరకు నిర్మాణం పూర్తి Quote
Navyandhra Posted March 12, 2018 Author Report Posted March 12, 2018 During the 53rd Polavaram review held in the Secretariat, the Chief Minister enquired the progress of all priority projects in the state. In the list of the 21 projects that were added to the list of priority projects last week, the Chief Minister added 2 more: Gundarevula Reservoir and the modernisation of the left and right main canals of Thotapalli project. Out of all the 52 priority projects, 8 have been inaugurated and 5 are ready for inauguration. At the cost of ₹10,000 crores, all the 29 older priority projects will be completed by June. The Polavaram Irrigation Project has reached an overall progress of 54%, officials reported to the Chief Minister. This includes the head works, the Right Main Canal and the Left Main Canal. 70% of the excavation for the spillway and spill channel has been completed, i.e., 778.8 lakh cubic metres out of 1,115.59 lakh cubic metres. 34% of the concreting for the spillway and the stilling basin is completed, accounting for 5.57 lakh cubic metres out of 16.39 lakh cubic metres. This week, 1.26 lakh cubic metre of earthwork was excavated, and 17,000 cubic metres of concrete was laid for the spillway and stilling basin. 18.8 metres of the diaphragm wall was also completed this week. Overall, 41.2% of the head works have been completed. Other main components of the dam that have shown consistent progress are the diaphragm wall (72%), radial gates (58%) and the jet grouting for the Coffer dam (78%). The Chief Minister also presented Keller Ground Engineering Pvt. Ltd. with an award for completing a significant amount of the Ground Engineering works of the Polavaram Irrigation Project. The award was given to the company by the Construction Industry Development Council at the 10th CIDC Vishwakarma Awards 2018. Monday marks the completion of 30 days since the 116-day programme, ‘Jalasamrakshana Udyamam’ began. Officials from Neeru Pragati presented the progress report of the programme, and informed the Chief Minister that works worth ₹247 crore have been completed. These activities include desilting, restorations of MI tanks, tank feeder channels, check dams, farm ponds, major and minor irrigation canals and drains. They have also conducted workshops to sensitise people about water conservation in districts that are prone to drought. The Chief Minister asked officials to keep the pace and progress of the programme high and consistent. Quote
Navyandhra Posted March 12, 2018 Author Report Posted March 12, 2018 polavaram drc agreed to cofferdam height and length, spillway, assigning work to navayuga. only designs of main dam(ecrf) pending. by 2019 may cofferdam will get completed. by 2019 december or worst case 2020 main dam will get completed. no need to worry , center already filed affidavit in supreme court by saying orissa, chattisagarh, telangana has no locus stand in opposing the work. all the cases are in the ngt quashed. currently supreme court want all 6 states to file affidavit by saying they are agree with godavari tribunal. only problem here is funding for project particulary r&r . i don't think center will revise estimates from 16,000 crores to 58,000 crores. if ap can arrange funds it can complete project. 9 coastal districts depends on this project . i hope center will provide funding . otherwise cbn will arrange funding to complete this project. don't worry about permissions . they won't provide funding. they transferred 7 mandals to ap , as it is free for them .it won't have to pay single paisa for this thing. in kaleshwaram they gave permissions . they praise tg government which are free . they didn't gave single rupee they want support at free of cost. Quote
Navyandhra Posted March 12, 2018 Author Report Posted March 12, 2018 నేషనల్ జియోగ్రాఫిక్ చానల్లో ‘పోలవరం’ పోలవరం నిర్మాణ పనులపై ప్రత్యేక కథనాలు త్వరలో నేషనల్ జియోగ్రాఫిక్ చానల్లో ప్రసారం కానున్నాయి. 2డీ, 3డీ రూపంలో 22 నిమిషాలపాటు ఈ చానల్ ప్రత్యేక కథనాలు ప్రసారం చేస్తుంది. అలాగే నిర్మాణం తీరుపై ఒక పుస్తకాన్ని విడుదల చేయనుంది. డ్రోన్లు, విమానం, హెలికాప్టర్ను వినియోగించి ఆ చానల్ ప్రత్యేక కార్యక్రమాలను రూపొందించనుంది. వచ్చే మూడు నెలల్లో ఈ కార్యక్రమాలకు సంబంధించి టెలిఫిలింను రూపొందించనుంది. ఇందుకోసం రాష్ట్ర జల వనరుల శాఖ రూ.75 లక్షలు చెల్లిస్తుంది. ఆ శాఖ కార్యదర్శి శశిభూషణ్ గురువారం ఈ మేరకు ఉత్తర్వు జారీ చేశారు. సహజంగా ఈ చానల్ ప్రభుత్వ కార్యక్రమాలపై ప్రత్యేక కథనాలు ప్రసారం చేయదు. ప్రాయోజిత కార్యక్రమాల రూపంలోనూ ప్రభుత్వ పథకాలను చిత్రీకరించదు. కానీ ఈ ప్రాజెక్టుపై ప్రత్యేక కార్యక్రమ రూపకల్పనకు ముందుకు రావడం విశేషం. Quote
Navyandhra Posted March 12, 2018 Author Report Posted March 12, 2018 Gundarevula Reservoir and the modernisation of the left and right main canals of Thotapalli project. Out of all the 52 priority projects,8 have been inaugurated and 5 are ready for inauguration. At the cost of ₹10KCr,all the 29 older priority projects will be completed by June Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.