Jump to content

India’s First EnginelessTrain Is All Set To Replace The Shatabdi With Trials Starting Next Month


Recommended Posts

Posted

Indian Railways is all set for a giant technological leap. Engineless trains till now have been limited to metro network in India. However, according to a report by TOI, Indian Railways will roll out its first Made-in-India engineless train by November 2018.

 
52d4b738-5fc0-4c33-8286-fd64540725e1.jpg Source: Zeebiz

 

16dc7668-23a7-4778-874a-e3601a935f79.jpg Source: Zeebiz
 

 

Known as 'Train 18', it has been conceptualised, designed, and manufactured entirely in India. The train which looks like a bullet train is self-propelled and does not need an engine.

This one of its kind train in India is being built in a record time of 20 months at the Integral Coach Factory, Chennai at an expected cost of ₹100 crore. 

63b06e72-12c9-4243-b001-7c5a696ca493.jpg Source: Zeebiz

 

It will have 16 coaches and will take over the routes of Shatabdi Express like Delhi-Bhopal, Chennai-Bengaluru, and Mumbai-Ahmedabad. These trains will be equipped with all the latest amenities and are slated to cut travel time by 10-15%.

There'll be separate space for baby care and toilets for disabled people.

5b108255-3475-4bfe-97b0-518586ab5760.jpg Source: Twitter
 

 

The train will also have rotating seats in two of its executive class coaches. 

These seats have been imported from Spain and can rotate by 360 degrees giving the passengers a straight-on view of the scenery. 

b840f424-7ef9-4eef-98b1-c008f1acb04b.jpg Source: Twitter

 

The train also has a continuous profile that will allow the passengers to look at the panel in the cockpit.

As far as safety features are concerned, Train 18 will have 6 CCTV cameras and an emergency switch in each coach. Passengers will also have the facility to talk to the driver.

0a9ba366-85f4-48c2-963c-ce319ab13d6d.jpg Source: Twitter
 

 

Train 18 will probably be talking to the wind travelling at a speed of 160 kmph and the trials will be done in three phases.

Speaking to TOI, Chief Public Relation Officer of Research Designs and Standards Organisation(RDSO), A K Sinha said:

The first trial would be conducted on the Bareilly-Moradabad section on standard railway track to achieve normal speed of 115 kmph. Later in the second phase, the train would touch 180 kmph between Kota-Sawai Madhopur stretch, while the final would be on New Delhi-Bhopal section via Agra.
c93ba442-fa54-42d6-b9bf-71600c70c7cb.jpg Source: Zeebiz

 

Once it is approved for operation, Train 18 will replace the currently running Shatabdi Express on various routes.

Posted
1 minute ago, mettastar said:

engineless ante power etla vasthadi ? electric anaa meaning ?

separate locomotive normal trains lo untayi ga ala kakunda metro madiri train ani kavi bhavam anukunta

Posted
Just now, JANASENA said:

separate locomotive normal trains lo untayi ga ala kakunda metro madiri train ani kavi bhavam anukunta

aa news rasinvadu brainless anukunta andukee engineless ani rasadu 

Posted
Just now, solman said:

aa news rasinvadu brainless anukunta andukee engineless ani rasadu 

yup! true

Posted

Delhi-Bhopal - ee route lo kotta train la velli in return passenger train la venakki vashthundi @3$%

Posted
Just now, JANASENA said:

Delhi-Bhopal - ee route lo kotta train la velli in return passenger train la venakki vashthundi @3$%

  • edho okati return vastundhi kada danki happy feel avali :giggle:
Posted
Just now, solman said:
  • edho okati return vastundhi kada danki happy feel avali :giggle:

@3$%

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...