Jump to content

Mid Manair dam being filled up by KLIS


Recommended Posts

Posted

Mid Manair project was incepted in 2006 but works didn’t move until 2014, KCR cancelled IVRCL contract and increased the capacity from 6TMC to 26 TMC. Construction was fast tracked and completed within a period of 17 months. Initially planned for only drinking water needs to source from sriram sagar project but sriram sagar itself is in dire need of water as there are no inflows from upper godavari due to babli and other maharastra projects. Kaleshwaram is the saving grace as everyone is hopeful that KLIS will supplement and fill 90tmc in sriram sagar and 25 tmc in mid maniar this year

 

Also one misunderstood notion is that KLIS will consume 5000 crores of electricity..that is the max limit and worst case scenario i.e. if they have to lift all 400 tmc of water.

But the best case scenario is that they need not turn on motors in link 1 and link2 for example if sriram sagar receives water through flood canal, it will supplement itself and will automatically  feed mid manair and low manair projects also.

Couple of weeks ago in link 1, yellampally received water through flood and they turned off the motors in medigadda and sundilla

 

  • Like 1
  • Upvote 1
Posted

inka 100 km shamirpet lake  in straight line to Hyderabad looks like by his 2nd term KCR will give Hyderabad unlimited water supply ...

 

 

Posted
Just now, AntheKada said:

inka 100 km shamirpet lake  in straight line to Hyderabad looks like by his 2nd term KCR will give Hyderabad unlimited water supply ...

 

 

AntheKada ee hollywood hero evaru kaka

Posted

10 tmc water for the first time in mid manair reservoir, first time water crest gates touch ayindi anta. 170 kms back water 💦 for now

 

 

 

Posted

naku endhuko enka full fledged ga water usse chesukovatledhu anipisthundi....   epatiki they need to use all godavari water and fill canals and tanks ... enka adhi jaragaledhu anukunta ...hopefuly next year avvali 

Posted
1 minute ago, argadorn said:

naku endhuko enka full fledged ga water usse chesukovatledhu anipisthundi....   epatiki they need to use all godavari water and fill canals and tanks ... enka adhi jaragaledhu anukunta ...hopefuly next year avvali 

Inka chaala work pending vundi. Will take years. 

Posted

Haters are nicely skipping this thread, ppl who oppsed KCR are not abel to digest the fact saying something like this is happening ..

  • Upvote 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...