Sachin200 Posted January 9, 2020 Report Posted January 9, 2020 Jammu: Kashmir will be connected to the rest of India through railway network by December next year as the government has set a fresh deadline for completion of the world's highest railway bridge. The rail line is expected to be 35 metres taller than the Eiffel Tower. Konkan Railway has said it was most challenging project in the post-independent history of the Indian Railways. It is most challenging task in the 150-year-long history of the railways. The highest railway bridge in the world, connecting Kashmir with rest of country through rail line will be completed by December 2021," Konkan Railway Chairman Sanjay Gupta told reporters in Jammu on Wednesday night. "The construction of the bridge is the most challenging part of the Kashmir rail link project undertaken post-independence and, once completed, it will be an engineering marvel," Mr Gupta said. The massive arch-shaped structure, being constructed in hostile terrain, have used over 5,462 tonnes of steel will be 359 metres above the river bed, he added. Designed to withstand wind speeds of up to 260 km per hour, the 1.315-km-long "engineering marvel" will connect Bakkal (Katra) and Kauri (Srinagar). The bridge forms a crucial link in the 111-km stretch between Katra and Banihal, which is part of the Udhampur- Srinagar-Baramulla rail link project. Once completed, it will surpass the record of the Beipan river Shuibai railway bridge (275 m) in China The Udhampur-Srinagar-Baramulla rail link project is highly essential to provide an alternative and a reliable transportation system to Jammu and Kashmir to join Kashmir Valley to the Indian Railways network, Gupta said. He added that in view of the importance of this project in providing seamless and hassle-free connectivity in Jammu and Kashmir, the project was declared as national project in 2002 1 Quote
lovemystate Posted January 9, 2020 Report Posted January 9, 2020 The bridge anyway is compleltely designed and constructed by foreign companies. all indian govt needs to do is pay. Quote
Anta Assamey Posted January 9, 2020 Report Posted January 9, 2020 Just now, lovemystate said: The bridge anyway is compleltely designed and constructed by foreign companies. all indian govt needs to do is pay. Lets pay in Dollars ... Quote
lovemystate Posted January 9, 2020 Report Posted January 9, 2020 3 minutes ago, Anta Assamey said: Lets pay in Dollars ... ofcourse using the remittance money of south indians and then laugh at their language. Quote
Sachin200 Posted January 9, 2020 Author Report Posted January 9, 2020 6 minutes ago, lovemystate said: The bridge anyway is compleltely designed and constructed by foreign companies. all indian govt needs to do is pay. Microsoft sandranna invention kadha 1 Quote
Chinna84 Posted January 9, 2020 Report Posted January 9, 2020 2 hours ago, lovemystate said: they probably meant 2100 Baboru ayithe 3 months lo finish chesthaaru ga !! (Ofcourse, as usual adhi kuda PPT laagane anuko) Quote
Chinna84 Posted January 9, 2020 Report Posted January 9, 2020 2 hours ago, lovemystate said: The bridge anyway is compleltely designed and constructed by foreign companies. all indian govt needs to do is pay. Amaravathi lo ituka ituka perchindhi Baboru & Pappu mari. Quote
Kool_SRG Posted January 9, 2020 Report Posted January 9, 2020 1 minute ago, libraguy86 said: Ithey bagundunu but itada? It heading for completion possibly 2-3 yrs down the line... Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.