Jump to content

Best SOuth INdian cities according to you veyyandi..


Recommended Posts

Posted
Just now, panipoori said:

MMTS useful antunnava? khali tirugutaayi bro aaa trains and also station kuda khaligaa vntndi

yes. nenu okka saari Hyd ochinappudu I think I went from lakdikapul to jntu or something. I forgot. total khaali train.

4yrs back le. may be not peak hr emo anukunna.

Posted
1 hour ago, pottipotato said:

Tuticorin

Tirunelveli

Coimbatore

Tiruppur

Idly

samber

Chutney

Posted
2 minutes ago, Kool_SRG said:

Okkappudu kaali ippudu baane undi occupancy... Occupancy lekunte enthuku run chestaarantaav. 

 

Chennai lo timing tho sambandham lekunda tirugutaaru janalu

Posted
3 minutes ago, panipoori said:

 

Chennai lo timing tho sambandham lekunda tirugutaaru janalu

More over expansion is planned Secunderabad to ghatkesar and secunde bolarum and medchal daaka already medchal daaka electrification kuda almost 80% daaka done... 

Posted
25 minutes ago, Kool_SRG said:

Okkappudu kaali ippudu baane undi occupancy... Occupancy lekunte enthuku run chestaarantaav. 

mmts mostly kali ga nadustahyi uncle .... 

Posted
17 minutes ago, Kool_SRG said:

More over expansion is planned Secunderabad to ghatkesar and secunde bolarum and medchal daaka already medchal daaka electrification kuda almost 80% daaka done... 

Dabuulu bokkaa....they can scrap the whole MMTS

Posted
47 minutes ago, panipoori said:

Dabuulu bokkaa....they can scrap the whole MMTS

wrong. the current patronage is about 2 lakh people per day.

phase 2 open ayite malkajgiri to hitec city line estalish ayitadi..the patronage might go up to 3 lakh per day

Posted
10 minutes ago, hyperbole said:

wrong. the current patronage is about 2 lakh people per day.

phase 2 open ayite malkajgiri to hitec city line estalish ayitadi..the patronage might go up to 3 lakh per day

that is like less than 10% of chennai daily ridership and  2 % of  mumbai's daily

Posted
16 minutes ago, panipoori said:

that is like less than 10% of chennai daily ridership and  2 % of  mumbai's daily

MMTS was intended to connect western suburbs(industrial towns like BHEL, Lingampally etc) with the city and was never a main stream thing. With those suburbs now almost merged into the city limits we started seeing the ridership go up..With Phase 2 nearly will add another 84 kms to the existing 43 kms and more over phase connect 2 connects eastern suburbs with the central and western business districts. I will not be surprised if the patronage will double once the phase 2 opens. 

The first section of MMTS came up along Secunderabad-Lingampally (23 km), Hyderabad – Lingampally (24 km) in 2003 and Secunderabad – Faluknuma (14.54 km) in 2004.

MMTS Phase- II project has been proposed for a distance of 84 km on various stretches including Secunderabad-Moula Ali–Ghatkesar, Secunderabad–Bolarum-Medchal, Moula Ali– Sanathnagar and Tellapur–Ramchandrapuram.

MMTS-snip.png

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...