Mirage Posted May 2, 2020 Report Posted May 2, 2020 The Indian Railways has used the lockdown period and the resultant suspension of passenger services to address long-pending maintenance work on the rail network, the national transporter said in a statement on Saturday. This, it said, would improve safety and operational efficiencies. Around 500 modern heavy duty Track Maintenance Machines along with track, signal and Overhead Equipment (OHE) maintainers have worked regularly for 10,749 machine days to complete overdue track maintenance of 12,270 km plain track, it said. Quote
Mirage Posted May 2, 2020 Author Report Posted May 2, 2020 Ultrasonic flaw detection (USFD) of 30,182 km of track and 1,34,443 rail welds has been carried out with USFD machine. "Indian Railways planned these works during lockdown period considering it 'Once in a lifetime opportunity' to wipe out these maintenance arrears and take up the execution of work without affecting the train service," it said. Health of the track has been monitored through periodic runs of Oscillation Monitoring System (OMS) cumulating 1,92,488 km of track at 5,362 peak locations indicated by OMS test has been attended to ensure proper quality. Critical summer precaution activities like de-stressing of long welded rail (LWR) which involved huge men power has been taken up with a new procedure for carrying out the work with ensuring social distancing norms. A total of 2,246 km of de-stressing of LWR has been done. Track work conducted during the lockdown include remodelling of Kazipet Yard, Vijayawada Yard, Bangalore City yard, Baroda station. Important bridge works include re-girdering of Bridge No. 86 on Tunga River near Shivamogga Town, dismantling of Road Over Bridge (ROB) near Chennai Station, construction of bridge in Rajahmundry-Vishakhapatnam section, launching of 6 Foot Over Bridges (FOBs) under Bhusawal division among others, according to the statement. Quote
Kool_SRG Posted May 2, 2020 Report Posted May 2, 2020 They certainly have 1 month more in hand for sure to take up the works... Â I like Indian Railways and traveling by train. Quote
mustang302 Posted May 2, 2020 Report Posted May 2, 2020 Money dhandukovadam matram stop avvadhanammata 🤣 Quote
CH_Desi Posted May 2, 2020 Report Posted May 2, 2020 Nice, hopefully will reduce accidents due to these flaws to zero. Hyderabad lo kuda road maintenance works chestunnaru kada. Quote
Mirage Posted May 2, 2020 Author Report Posted May 2, 2020 53 minutes ago, Kool_SRG said: They certainly have 1 month more in hand for sure to take up the works...  I like Indian Railways and traveling by train. Yup Railway commute is the best for journeys up-to 1000 kilometers anipisthadi  Quote
Mirage Posted May 2, 2020 Author Report Posted May 2, 2020 Just now, CH_Desi said: Nice, hopefully will reduce accidents due to these flaws to zero. Hyderabad lo kuda road maintenance works chestunnaru kada. Yeah. Quote
pahelwan Posted May 2, 2020 Report Posted May 2, 2020 57 minutes ago, Kool_SRG said: They certainly have 1 month more in hand for sure to take up the works... Â I like Indian Railways and traveling by train. Except that bathroom kampu and people trying to sneak into reservation coaches everything else is good Quote
Mirage Posted May 2, 2020 Author Report Posted May 2, 2020 Just now, pahelwan said: Except that bathroom kampu and people trying to sneak into reservation coaches everything else is good Bathroom better avthunayi emadyala anipinchindi general reservation cars lo you cannot control.. A/C cars lo takkuve kada Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.