Jump to content

Polavaram/ Kaelshwaram Cost entha kaka


Recommended Posts

Posted
Just now, kidney said:

oka water project.. say like Mission kaleshwaram/ Bhageeratha......   2-3 years lo annapurna state avuthadhi anukuntunna

U know Uttarandra sujala sravanthi project

Epudu Start chesaroo,asaliki UA lo enni projects unayo telusa negligible

Seema lo prathi 3 assembly constituencies ki Oka project

 

Posted
2 minutes ago, AndhraneedSCS said:

We are getting water from Pattiseema (Our village is in between Godavari and Krishna )

Gud to hear.. we need a full project which provides water even to Southern AP

Posted
2 minutes ago, Silverado said:

U know Uttarandra sujala sravanthi project

Epudu Start chesaroo,asaliki UA lo enni projects unayo telusa negligible

Seema lo prathi 3 assembly constituencies ki Oka project

 

I wish these projects get completed...   

Posted

One of the main reason for Polavaram delay is because of Rehab. 

CBN gravely mishandled this part of the project. Three states lo rehab ni CBN thought he can manage. Pakka state la elu petti gelikithe cheppu tho kodtaru anna chinna logic marchipoindu...Orissa and Telangana nundi NOC's raledu, motham as usual nashanam patichindu.

  • Upvote 1
Posted
1 minute ago, kidney said:

I wish these projects get completed...   

Uttarandra rastraniki chivarlo ledu ,chivaraki viseraybadindi by CM's 

Existing & Proposed Major dams and reservoirs:

Name & Place Gross Storage (TMC) River Basin Constructed Year Command Area (acres)
Nagarjuna Sagar Dam, Vijayapuri South 312 Krishna River 1967  
Srisailam Dam, Srisailam 216 Krishna River 1981  
Polavaram Project, Polavaram 194 Godavari River Under Construction  
Somasila Dam, Somasila village 75 Penna River 1917  
Pulichinthala Project, Pulichinthala village 45.77 Krishna River 2009  
Nallamalasagar Reservoir, Markapur 43.5 Krishna River Under Construction  
Jalaput Dam, Jalaput 34.27 Machkund River 2000  
Gandikota Reservoir, Gandikota village 26.84 Penna Riverand Chitravathi River 2013  
Kalyani Dam, Tirupati 25 Swarnamukhi River 1977  
Brahmamsagar Reservoir, Bramhamgari Matham 17.73 Penna River 1984  
Velugodu Balancing Reservoir, Velgode 16.95 Galeru River 2016  
PABR Dam, Penna Ahobilam 11.10 Penna River 1983  
Vykuntapuram Barrage, Amaravati 10 Krishna River Under Construction  
Chitravathi Balancing Reservoir, Parnapalli village 10 Chitravathi River 2003  
Mylavaram Dam, Mylavaram 9.96 Penna River 1815  
Dowleswaram Barrage, Rajahmundry 5.14 Godavari River 1970  
Mid Pennar Dam, Marutla village 5 Penna River 1980  
Veligallu Dam Reservoir, Galiveedu 4.64 Papagni River 1972  
Rajolibanda Dam, Kurnool 4 Tungabhadra River 1956  
Gundlakamma Reservoir Project, Chinnamallavaram 3.85 Gundlakamma River 1978  
Tatipudi Reservoir, Tatipudi 3.32 Gosthani River 1968  
Prakasham Barrage, Vijayawada 3 Krishna River 1957  
Thotapalli Barrage, Thotapali village 2.51 Nagavali River 2015  
Sanjeevaiah Sagar Dam, Gajuladinne village 2 Handri River 2013  
Sunkesula Barrage, Kurnool 1.25 Tungabhadra River 1861  
Jeedipalli Reservoir, Jeedipalli village 1.69 Handri River 2012  

Gollapalli Reservoir,

Penukonda

1.91 Handri River 2016
Posted

Kasu brahmanandam Reddy ,CBN thappa

Uttarandra irrigation ki evadu chesindhi em ledu

Posted
Just now, Silverado said:

Uttarandra rastraniki chivarlo ledu ,chivaraki viseraybadindi by CM's 

Existing & Proposed Major dams and reservoirs:

Name & Place Gross Storage (TMC) River Basin Constructed Year Command Area (acres)
Nagarjuna Sagar Dam, Vijayapuri South 312 Krishna River 1967  
Srisailam Dam, Srisailam 216 Krishna River 1981  
Polavaram Project, Polavaram 194 Godavari River Under Construction  
Somasila Dam, Somasila village 75 Penna River 1917  
Pulichinthala Project, Pulichinthala village 45.77 Krishna River 2009  
Nallamalasagar Reservoir, Markapur 43.5 Krishna River Under Construction  
Jalaput Dam, Jalaput 34.27 Machkund River 2000  
Gandikota Reservoir, Gandikota village 26.84 Penna Riverand Chitravathi River 2013  
Kalyani Dam, Tirupati 25 Swarnamukhi River 1977  
Brahmamsagar Reservoir, Bramhamgari Matham 17.73 Penna River 1984  
Velugodu Balancing Reservoir, Velgode 16.95 Galeru River 2016  
PABR Dam, Penna Ahobilam 11.10 Penna River 1983  
Vykuntapuram Barrage, Amaravati 10 Krishna River Under Construction  
Chitravathi Balancing Reservoir, Parnapalli village 10 Chitravathi River 2003  
Mylavaram Dam, Mylavaram 9.96 Penna River 1815  
Dowleswaram Barrage, Rajahmundry 5.14 Godavari River 1970  
Mid Pennar Dam, Marutla village 5 Penna River 1980  
Veligallu Dam Reservoir, Galiveedu 4.64 Papagni River 1972  
Rajolibanda Dam, Kurnool 4 Tungabhadra River 1956  
Gundlakamma Reservoir Project, Chinnamallavaram 3.85 Gundlakamma River 1978  
Tatipudi Reservoir, Tatipudi 3.32 Gosthani River 1968  
Prakasham Barrage, Vijayawada 3 Krishna River 1957  
Thotapalli Barrage, Thotapali village 2.51 Nagavali River 2015  
Sanjeevaiah Sagar Dam, Gajuladinne village 2 Handri River 2013  
Sunkesula Barrage, Kurnool 1.25 Tungabhadra River 1861  
Jeedipalli Reservoir, Jeedipalli village 1.69 Handri River 2012  

Gollapalli Reservoir,

Penukonda

1.91 Handri River 2016

 

hhmm gandikota, Velugodu, penukonda...   new major projects _-_

Posted
1 minute ago, kidney said:

 

hhmm gandikota, Velugodu, penukonda...   new major projects _-_

Aithe enti

Nenu adigindi enti ,UA was pushed away from development

Posted
2 hours ago, Silverado said:

Bokka undi Godavari ,most neglected part UA

Vizag varake radu godari , drinking water tadipudi nunchi teskuntaru

Urgent ga vamsadhara Pai projects katali,

Sujala Sravanthi vamsadhara paine kaduthunaru anukunta

Posted
23 minutes ago, Silverado said:

Rayalaseema development udyamam anedhi

Selfish forces funding tho election mundu drama adataru

When rayalaseema person is in Cm chair no one will question him

Kosta people like bhavam venkatram Reddy,ntr,kasu.   Cm Lu ayimapudu edustaru Seema batch politicians they instigate rayalaseema udyamam

Byreddy Raja sekhar reddy vanti swardha arulu ade ga chesindi

Posted
1 minute ago, bhaigan said:

Sujala Sravanthi vamsadhara paine kaduthunaru

Nayana adhi purshottupatnam lift in E.G

Posted
20 minutes ago, Silverado said:

Develop Uttarandra first 

Thats the reason they are moving executive capital to Vizag

Posted
Just now, bhaigan said:

Byreddy Raja sekhar reddy vanti swardha arulu ade ga chesindi

Ys emaina thakkuva tinnnada

Ravindranth Reddy gadu chetha rayalaseema udayamama cheinchadu to become cm

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...