3 minutes ago, snoww said:

Easily 20 years padathadi emo motham completion ki ?

 Em le this will be election issue 

2024 so fast ga complete chestaru

Posted
1 minute ago, kevinUsa said:

 Em le this will be election issue 

2024 so fast ga complete chestaru

Kashtam anukunta 2024 lo full plan finish seyyatam. YSR time lo ring road ee bedirinchi land acquisition sesina kooda 10 years pattindi land rates dead seap vunna time lone. 

Ippudu land acquisition ke sukkalu kanipisthayee. 

Posted
14 minutes ago, snoww said:

Kashtam anukunta 2024 lo full plan finish seyyatam. YSR time lo ring road ee bedirinchi land acquisition sesina kooda 10 years pattindi land rates dead seap vunna time lone. 

Ippudu land acquisition ke sukkalu kanipisthayee. 

Agreed. 

 

Posted
25 minutes ago, kevinUsa said:

 Em le this will be election issue 

2024 so fast ga complete chestaru

Impossible money needed

Posted
3 minutes ago, argadorn said:

Impossible money needed

Central istadi lee

Posted
3 hours ago, jawaani_jaaneman said:

Mall kada eda ? Ae ooru ? Manolle kaka akadi oorla antha...manchi kallu belt..

Exact ooru name telvadu but before RRR ee 1 cr+ undi

Ippudu entha undo mari

Mall lo Raja reddy telusa

Posted
3 hours ago, snoww said:

Kashtam anukunta 2024 lo full plan finish seyyatam. YSR time lo ring road ee bedirinchi land acquisition sesina kooda 10 years pattindi land rates dead seap vunna time lone. 

Ippudu land acquisition ke sukkalu kanipisthayee. 

Appudu acquisition was dead easy and central government was in full support of state . 

Ippudu acquisition law tho chala cost plus lot of litigations and central government is not that supportive . 

Ippudu aye pani kadhu 

Posted
4 hours ago, snoww said:

Vunna roads meeda nundi pani kaanisthe better. Otherwise nuvvu annattu land acquisition saala kashtam. Many Remote TG villages lo kooda acre land minimum 50 lakhs ki lepaaru ippudu. 

Already 161aa ni dhenla kalapalani plan chesinaru kadha...jagadevpur to bhongir...

Posted

The RRR project corridor is divided into four quadrants with reference to the crossing points of National Highways. North East Quadrant: Tupran (NH- 44) to Malkapur (NH - 65) with a length of 93.65 km. South East Quadrant covers Malkapur (NH - 65) to Shadnagar (NH - 44)  with a length of 78.150 km.

The South West Quadrant covers Shadnagar (NH - 44) to Koulampet (NH -  65) with 68.150 km while North West Quadrant passes from Koulampet (NH - 65) to Tupran (NH - 44)  with 50 km. The RRR connects Ibrahimpatnam, Bibinagar, Bommalaramam, Mulugu, Kothur, Malkapur, Shadnagar, Warangal, Toopran, Dunti, Shivampet, Narsapur, Daulatabad, Isamilapet, Eddumailaramam, Shankarapply, Chevella, Tadlapalle, Shahbad, Farooq Nagar, Kothiyal, Gundlaguda and  Rachlur etc. It passes through 125 villages all along the alignment. There are about 25 spinal roads connecting ORR to RRR.

These include 10 National and State Highway roads and the remaining are new spinal roads and these will provide connectivity from ORR to RRR. The cost of the project is around Rs 2,500 crore for two lane carriageway and around Rs 5,000 crore for four lane carriageway, which also includes land acquisition cost.
The RRR passes through the existing road on five Reserve Forest areas which requires widening. They include Mulugu (1.700 km),  Muduchintalapally (1.100 km), Kothiyal (0.600 km), Kappa Pahad (2 km) and Narsapur (4.300 km). It passes through four level crossings near Brahmanpally, Shankarpally, Lingareddyguda and Pagidipally.The RRR was envisaged for decentralised growth of the city and proposed to develop multiple sub nuclei centres around Hyderabad.

Posted
17 minutes ago, tom bhayya said:

The RRR project corridor is divided into four quadrants with reference to the crossing points of National Highways. North East Quadrant: Tupran (NH- 44) to Malkapur (NH - 65) with a length of 93.65 km. South East Quadrant covers Malkapur (NH - 65) to Shadnagar (NH - 44)  with a length of 78.150 km.

 

 

The South West Quadrant covers Shadnagar (NH - 44) to Koulampet (NH -  65) with 68.150 km while North West Quadrant passes from Koulampet (NH - 65) to Tupran (NH - 44)  with 50 km. The RRR connects Ibrahimpatnam, Bibinagar, Bommalaramam, Mulugu, Kothur, Malkapur, Shadnagar, Warangal, Toopran, Dunti, Shivampet, Narsapur, Daulatabad, Isamilapet, Eddumailaramam, Shankarapply, Chevella, Tadlapalle, Shahbad, Farooq Nagar, Kothiyal, Gundlaguda and  Rachlur etc. It passes through 125 villages all along the alignment. There are about 25 spinal roads connecting ORR to RRR.

 

 

These include 10 National and State Highway roads and the remaining are new spinal roads and these will provide connectivity from ORR to RRR. The cost of the project is around Rs 2,500 crore for two lane carriageway and around Rs 5,000 crore for four lane carriageway, which also includes land acquisition cost.
The RRR passes through the existing road on five Reserve Forest areas which requires widening. They include Mulugu (1.700 km),  Muduchintalapally (1.100 km), Kothiyal (0.600 km), Kappa Pahad (2 km) and Narsapur (4.300 km). It passes through four level crossings near Brahmanpally, Shankarpally, Lingareddyguda and Pagidipally.The RRR was envisaged for decentralised growth of the city and proposed to develop multiple sub nuclei centres around Hyderabad.

Ilantivi jujubi , andharu velli ikkada konna tharuvatha malli alignment shift chestaru .

Posted

only thing I need to know is the road going above Sanga reddy towards Mumbai or below towards Hyderabad 

Posted
5 minutes ago, iddaritho said:

only thing I need to know is the road going above Sanga reddy towards Mumbai or below towards Hyderabad 

You will not know for another 3 months atleast...apativaraku enjaayyy

Posted

I have lot of land Kandi in sanga teddy lo chala farmer protest avuthunnayi 

I am little worried whether to dispose or keep it 

who will know the plan any minister will know it 

Posted
12 minutes ago, iddaritho said:

I have lot of land Kandi in sanga teddy lo chala farmer protest avuthunnayi 

I am little worried whether to dispose or keep it 

who will know the plan any minister will know it 

Unchu kaka ippudu kakapoyina inko 10 years ki iana atu side land cost perugudi

 

Posted
13 minutes ago, Hydrockers said:

Unchu kaka ippudu kakapoyina inko 10 years ki iana atu side land cost perugudi

 

It is 7 Crores per acre now 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...