Jump to content

December VB Released - EB2 India Assam with ROW Cutoff Date


Recommended Posts

Posted

As expected ROW now has a cutoff date:

 

Employment-
based
All Chargeability 
Areas Except
Those Listed
CHINA-
mainland 
born
EL SALVADOR
GUATEMALA
HONDURAS
INDIA MEXICO PHILIPPINES
1st C C C C C C
2nd 01NOV22 08JUN19 01NOV22 08OCT11 01NOV22 01NOV22
3rd C 01AUG18 C 15JUN12 C C
Other Workers 01JUN20 22JUN13 01JUN20 15JUN12 01JUN20 01JUN20
4th 22JUN22 22JUN22 15MAR18 22JUN22 15SEP20 22JUN22
Certain Religious Workers 22JUN22 22JUN22 15MAR18 22JUN22 15SEP20 22JUN22
5th Unreserved
(including C5, T5, I5, R5)
C 22MAR15 C 08NOV19 C C
5th Set Aside:
Rural (20%)
C C C C C C
5th Set Aside:
High Unemployment (10%)
C C C C C C
5th Set Aside:
Infrastructure (2%)
C C C C C C

 

E.  VISA AVAILABILITY IN THE EMPLOYMENT FIRST CATEGORY FOR CHINA AND INDIA

Increased demand and number use in the Employment First category, combined with decreased visa number availability for FY-2023 compared to FY-2022, will most likely necessitate the establishment of final action dates and application filing dates for China and India in the coming months to hold number use within the maximum allowed under the FY-2023 annual limits. This situation will be continually monitored, and any necessary adjustments will be made accordingly.

 

G.  RETROGRESSION OF INDIA EMPLOYMENT SECOND PREFERENCE FINAL ACTION AND APPLICATION FILING DATES FOR DECEMBER

Due to heavy applicant demand and significantly lower visa number availability for India E2 for FY-2023, corrective action was taken in October to keep number use within the maximum allowed under the FY-2023 annual limits.  However, higher than expected levels of demand in the Employment First and Employment Second categories has materialized this year, and as a result, fewer additional numbers will be available to India in the Employment Second category than originally estimated when the October and November final action and application filing dates were established. Therefore, further corrective action has been necessary to ensure that the limited supply of visa numbers is allocated by priority date in accordance with INA 203(e).  The situation will be continually monitored, and any necessary adjustments made accordingly.

  • Sad 3
Posted

People are expecting dates will move to 2015 and NO movement will happen for next 10 years. Enjoy H1-b life

Posted

Malli eb2 to eb3 loki jumping start chestaremo. 

Posted

@csrcsr @perugu_vada uncles did u receive your green cards.

Mandar uncle video lo after September 2 nd gc approve ainaavalli revocation letters vastundhi anta.  Mandar video lo USCIS draft undi anta gc approval on error is not valid anta 

Posted
1 minute ago, PakshiRaja said:

@csrcsr @perugu_vada uncles did u receive your green cards.

Mandar uncle video lo after September 2 nd gc approve ainaavalli revocation letters vastundhi anta.  Mandar video lo USCIS draft undi anta gc approval on error is not valid anta 

Lol I don’t think they will do that

Posted
2 minutes ago, PakshiRaja said:

@csrcsr @perugu_vada uncles did u receive your green cards.

Mandar uncle video lo after September 2 nd gc approve ainaavalli revocation letters vastundhi anta.  Mandar video lo USCIS draft undi anta gc approval on error is not valid anta 

ee revocation letters emti... brathakanivvara?

Posted
25 minutes ago, akkum_bakkum said:

As expected ROW now has a cutoff date:

 

Employment-
based
All Chargeability 
Areas Except
Those Listed
CHINA-
mainland 
born
EL SALVADOR
GUATEMALA
HONDURAS
INDIA MEXICO PHILIPPINES
1st C C C C C C
2nd 01NOV22 08JUN19 01NOV22 08OCT11 01NOV22 01NOV22
3rd C 01AUG18 C 15JUN12 C C
Other Workers 01JUN20 22JUN13 01JUN20 15JUN12 01JUN20 01JUN20
4th 22JUN22 22JUN22 15MAR18 22JUN22 15SEP20 22JUN22
Certain Religious Workers 22JUN22 22JUN22 15MAR18 22JUN22 15SEP20 22JUN22
5th Unreserved
(including C5, T5, I5, R5)
C 22MAR15 C 08NOV19 C C
5th Set Aside:
Rural (20%)
C C C C C C
5th Set Aside:
High Unemployment (10%)
C C C C C C
5th Set Aside:
Infrastructure (2%)
C C C C C C

 

E.  VISA AVAILABILITY IN THE EMPLOYMENT FIRST CATEGORY FOR CHINA AND INDIA

Increased demand and number use in the Employment First category, combined with decreased visa number availability for FY-2023 compared to FY-2022, will most likely necessitate the establishment of final action dates and application filing dates for China and India in the coming months to hold number use within the maximum allowed under the FY-2023 annual limits. This situation will be continually monitored, and any necessary adjustments will be made accordingly.

 

G.  RETROGRESSION OF INDIA EMPLOYMENT SECOND PREFERENCE FINAL ACTION AND APPLICATION FILING DATES FOR DECEMBER

Due to heavy applicant demand and significantly lower visa number availability for India E2 for FY-2023, corrective action was taken in October to keep number use within the maximum allowed under the FY-2023 annual limits.  However, higher than expected levels of demand in the Employment First and Employment Second categories has materialized this year, and as a result, fewer additional numbers will be available to India in the Employment Second category than originally estimated when the October and November final action and application filing dates were established. Therefore, further corrective action has been necessary to ensure that the limited supply of visa numbers is allocated by priority date in accordance with INA 203(e).  The situation will be continually monitored, and any necessary adjustments made accordingly.

Pathetic bro

Posted
2 minutes ago, thanks said:

2015 June nadi.. H4 EAD ki velli dates current ayyaka h1 ki ravocha?

You can max counselor processing avasaram unte

  • Thanks 1
Posted
Just now, csrcsr said:

Wow lucky ga August lo vachindi bri

2013 PD mostly vachinaaya bro

Posted
9 minutes ago, PakshiRaja said:

@csrcsr @perugu_vada uncles did u receive your green cards.

Mandar uncle video lo after September 2 nd gc approve ainaavalli revocation letters vastundhi anta.  Mandar video lo USCIS draft undi anta gc approval on error is not valid anta 

naadi Sep 3rd undi date 

Posted
Just now, Spartan said:

naadi Sep 3rd undi date 

That's rumor anna one or two don't think about it🙏 we have enough shiit to deal with

  • Thanks 1
Posted
1 minute ago, PakshiRaja said:

2013 PD mostly vachinaaya bro

2014 August vallaki chala mandiki vachayi

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...