psycontr Posted November 21 Report Posted November 21 Historically GE tried to slowdown india anta. Arey arnab em speculation idhi Quote
MACH Posted November 21 Report Posted November 21 4 minutes ago, psycontr said: Historically GE tried to slowdown india anta. Arey arnab em speculation idhi 1 Quote
paaparao Posted November 21 Report Posted November 21 GE entire IT operations are outsourced to India. atleast 10000 people will be working from India for GE. Quote
Anta Assamey Posted November 21 Report Posted November 21 Idi jaragakapote...Then full positive credit GE ki istara...Ani agutunna GE employees... 1 Quote
pichhipullayya Posted November 21 Report Posted November 21 1 hour ago, psycontr said: Historically GE tried to slowdown india anta. Arey arnab em speculation idhi we are using GE F404 engines for Tejas MK1A and Mark 2 problem is GE is not supplying on time India is also running a risk that GE will shutdown supply chain for F404 Engines soon as it was originally developed for F-18 hornets AMCA ki we will get GE 414 Engines which are still being for F-18 super hornets. India is pushing for TOT and manufacture in India which GE is not doing even for the outdated old F404. Unless India can crack Kaveri engine or make safran ( french Engine maker) to agree on a similar engine with TOT and local manufacturing we will go no where. GE & Safran has a combined entity called CFM which manufactures engines for commercial and passenger aviation. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.