Jump to content

Revanth reddy real winner in central budget


Recommended Posts

Posted
1 hour ago, krishnaaa said:

It doesn't work like that.

Look at things in the perspective of buying a stock.

Lets say Hyderabad is a stock , don't you think the stock value will increase based on HSR?

HSR adds value, and there is no doubt about it, but my point is that we are way too late to the party. 

Hyd-Bangalore corridor. Consider the following points.

1. It is now being expanded to 3 lanes, expected to be completed in 2 years. 

2. By-pass roads at every human settlement

3. Present speed 120, with improved road conditions and safety, speed may go up to 140-150 in the next 10 years

4. Cruise control, FSD, automated cars, mass people movers like electric buses, etc., as an option for road transport and Hyd-BLR airport, with a flight every 30 mins.

My idea, it may not be worth investing now for the next 20 years travel. It it was already in construction now then it would have made a difference, created an ecosystem.

 

Posted
3 minutes ago, 2024 said:

vadu daily chepedhi sollu ee kada

@krishnaaa anna, tinani kuda ignore list lo vesava anna? Lekapothe why are you discriminating only me anna? India lo lancham ichi case veyista anna, pissful ga vundochu.

Posted
Just now, Jatka Bandi said:

@krishnaaa anna, tinani kuda ignore list lo vesava anna? Lekapothe why are you discriminating only me anna?

images?q=tbn:ANd9GcSmxByZmls6LRYA-tGhMto

Posted
4 minutes ago, Android_Halwa said:

HSR adds value, and there is no doubt about it, but my point is that we are way too late to the party. 

Hyd-Bangalore corridor. Consider the following points.

1. It is now being expanded to 3 lanes, expected to be completed in 2 years. 

2. By-pass roads at every human settlement

3. Present speed 120, with improved road conditions and safety, speed may go up to 140-150 in the next 10 years

4. Cruise control, FSD, automated cars, mass people movers like electric buses, etc., as an option for road transport and Hyd-BLR airport, with a flight every 30 mins.

My idea, it may not be worth investing now for the next 20 years travel. It it was already in construction now then it would have made a difference, created an ecosystem.

 

kaka inthaki high speed corridor = bullet train or just few miles greater than shatabdi/rajadhani/VB?

Posted
18 minutes ago, ARYA said:

kaka inthaki high speed corridor = bullet train or just few miles greater than shatabdi/rajadhani/VB?

Bullet Train, Totally new track, elevated and controlled. It completely runs on newly built track. Expected max speed about 350 kmph and average speeds at 220-250kmph. 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...