Jump to content

Hyderabad Metro Rail-1St Coach By Oct'2013


Recommended Posts

Posted

[quote name='Bongumudda' timestamp='1367430509' post='1303692143']


Idi completely PPP model project..govt job is to handover land to L & T...and moreover Govt involve avvakapovadame best...quality of service antaga vundadu Govt involve ithe.
[/quote]

PPP= private nd public partnership ... public in the sense, a govt designated/should be wing bhayya.. in the interests of civic... it should have control and it must have control.. period.


anduke anna indaka, HMR should have objected it in first place, and order/lobby L&T to go with 3rd rail rather than conventional and outmoded OHE technology

  • Replies 270
  • Created
  • Last Reply

Top Posters In This Topic

  • Lara400

    80

  • mahesh1

    57

  • peru_edaite_enti

    9

  • aamerica_seenu

    9

Posted

[quote name='Pallipatti' timestamp='1363154536' post='1303413973']

Edanna id proof ivvalemo lekapote 2 days lo cycles anni mayam. Chuddam em chestaro .
[/quote]

defent ga ivvali... vizag lo already e procedure going. to prevent pollution, every day morning beach raod lo cycles istharu for riding. they have to submit ID proof and take the cycle. once they done with riding they will return back and take back the ID proof.

e concept baaga work out ayindhi and its become early morning exercise to every one.

Posted

[quote name='Bongumudda' timestamp='1367429095' post='1303691961']
I will PM you a link, nenu akkada nunche ee metro news gather chestunta, akkada question adugu, you would get the answer.
[/quote]


Link ikkade post cheste andaram chaduvukuntam kada...[img]http://www.brahmanandamgifs.com/Images/GIFs/Anandam/2.gif[/img]

Posted

[quote name='Brahmanandam_AFDB' timestamp='1367431384' post='1303692306']


Link ikkade post cheste andaram chaduvukuntam kada...[img]http://www.brahmanandamgifs.com/Images/GIFs/Anandam/2.gif[/img]
[/quote]


[url="http://www.skyscrapercity.com/showthread.php?t=459134"]http://www.skyscrapercity.com/showthread.php?t=459134[/url]

inda saduvukoni ochi maatladu.. go .. ade nee imposition/assignment eeroju ki

Posted

[quote name='CBZ' timestamp='1367431451' post='1303692317']
[url="http://www.skyscrapercity.com/showthread.php?t=459134"]http://www.skyscrape...ad.php?t=459134[/url]

inda saduvukoni ochi maatladu.. go .. ade nee imposition/assignment eeroju ki
[/quote]


Adhi sadavali ante time pattettu vundi.... saduvukoni vasta...[img]http://www.brahmanandamgifs.com/Images/GIFs/Anandam/2.gif[/img]

Posted

The only proj in ap is working perfect I guess

Posted

[quote name='CITI' timestamp='1367432317' post='1303692449']
The only proj in ap is working perfect I guess
[/quote]


Yes bcoz of L & T and Kiran Kumar Reddy's wish entante tana hayam lo oka pedda project anna start avvalani danikosam govt time ki lands hand over cheyydam and funds release chestunnaru.

And works are moving at a rapid pace.

Posted

[quote name='CITI' timestamp='1367432317' post='1303692449']
The only proj in ap is working perfect I guess
[/quote]

:4_12_13:

Posted

Ninna Mumbai lo first commuter Metro rail start aindi....Hyderabad lo October lo trials start..

Posted

[url="http://www.youtube.com/watch?v=GTVW7YR1guo&feature=player_embedded"]http://www.youtube.com/watch?v=GTVW7YR1guo&feature=player_embedded[/url]

Posted

metro rail project is very good and its going on with a rapid development but not sure of the quality thought

Posted

NICE [img]https://lh4.googleusercontent.com/-hrUnDwoR2Vc/UWrxdzTr4BE/AAAAAAAAMXM/3ZQWqxop2FU/s144-c/PK.jpg[/img][img]https://lh4.googleusercontent.com/-hrUnDwoR2Vc/UWrxdzTr4BE/AAAAAAAAMXM/3ZQWqxop2FU/s144-c/PK.jpg[/img]

Posted

[quote name='manmadhan' timestamp='1367603936' post='1303702157']
metro rail project is very good and its going on with a rapid development but not sure of the quality thought
[/quote]

Speaking of quality, best in India when compared to other metros.

Posted

[b]Features of the Metro Rail Coach and Train:[/b]

• A train will consist of 3/6 coaches A.C. Coaches
• Each coach shall have 8 electrically powered exterior sliding bi-parting doors, 4 on each side and the doors open only at Metro Rail Stations.
• Width of each coach is scaled to 3.2m and the height of coach is 4.0m.
• Maximum service speed of the train is 80kmph and average speed is 34 kmph.
• The width of the elevated guide way structure is 9.6m with a lineup and down-line rail track signaling.

×
×
  • Create New...