Jump to content

Recommended Posts

Posted

number of toys= 75; cost of each toy=12

nx=900;

(n-5)(x+2)=980;

n^2-45n-2250=0;

valid n=75;

x=12;

  • Replies 191
  • Created
  • Last Reply

Top Posters In This Topic

  • Krish

    65

  • bio

    40

  • gabbarsingh1

    20

  • pandugadu999

    18

Posted

hello...manam no dialogues aa??...lol

 

Qns Adigina Kada..

Posted

16 men can finish a job in 16 days, If after 4 days manpower is increased by 14, then How many days will be needed to finish the job?

Posted

16 men can finish a job in 16 days, If after 4 days manpower is increased by 14, then How many days will be needed to finish the job?

 

3 days

Posted

[font='times new roman']16 men can finish a job in 16 days, If after 4 days manpower is increased by 14, then How many days will be needed to finish the job?[/font]

0 days...because the job is already finished
Mahi.gif
Posted

16 men can finish a job in 16 days, If after 4 days manpower is increased by 14, then How many days will be needed to finish the job?

 

5
 

Posted

3 days

 

 

0 days...because the job is already finished
Mahi.gif

 

 

5
 

 

 

wrong..:(

Posted

wrong.. :(

 

ithe 6 ayyuntadhi

Posted

ithe 6 ayyuntadhi

 

border lo unnav...clear ga cheppu ...how??

Posted

wrong..:(

Adi sarcastic ga anna...total days 10.4...after 4 days aithe 6.4 days
Posted

border lo unnav...clear ga cheppu ...how??

 

6.4, inadaka calulator use cheyyale

 

16 ki 16

 

after 4 days 12 days of work is left

 

so 16 people ki 12 days of work cheyyaneeki 12 days padthadhi

 

so 16+14 ki entha padthadhi....ante

 

16---->12

 

30----? 12/30/16 = 12/1.875 = 6.4
 

Posted

6.4, inadaka calulator use cheyyale
 

 

calculator use chesina 6.4 ee man brahmi+comedy+gifs+%25289%2529.gif

×
×
  • Create New...