Variety_Pullayya Posted August 28, 2019 Report Posted August 28, 2019 looks like no one is posting updates on this historic mission. pin the thread if people are interested Quote
Android_Halwa Posted August 28, 2019 Report Posted August 28, 2019 I have been following this on everyday basis... September 7th is the big day... Quote
Variety_Pullayya Posted August 28, 2019 Author Report Posted August 28, 2019 1 minute ago, Android_Halwa said: I have been following this on everyday basis... September 7th is the big day... soft landing will be monumental. having a rover on moon is a big step forward Quote
kingcasanova Posted August 28, 2019 Report Posted August 28, 2019 6 minutes ago, Variety_Pullayya said: looks like no one is posting updates on this historic mission. pin the thread if people are interested naa birthday roju landing plan chesaaru janaalu, thanks ISRO for the bday gift Quote
Android_Halwa Posted August 28, 2019 Report Posted August 28, 2019 1 minute ago, Variety_Pullayya said: soft landing will be monumental. having a rover on moon is a big step forward I think we came a loooong way...from transporting first satellite on bullock cart to having our own launch vehicles with a very good success rate everything built indigenous...is at one huge achievement and soft landing, and successful launch of rover and the data that it sends back will be the testimony of ISRO's success and a serious player in space research... Quote
battu Posted August 28, 2019 Report Posted August 28, 2019 following everyday..Planned maneuver ki update theda undhi ..donno if there is any correction Date Time Orbit around moon LOI/LBN#1 August 20, 2019 8:30-9:30 118 X 18078 LBN#2 August 21, 2019 12:30 – 13:30 121 X 4303 LBN#3 August 28, 2019 05:30 – 06:30 178 X 1411 LBN#4 August 30, 2019 18:00 – 19:00 126 X 164 LBN#5 September 01, 2019 18:00 – 19:00 114 X 128 Quote
Variety_Pullayya Posted August 28, 2019 Author Report Posted August 28, 2019 https://www.thehindu.com/sci-tech/science/chandrayaan-2-scans-mitra-crater/article29262668.ece Quote
Variety_Pullayya Posted September 1, 2019 Author Report Posted September 1, 2019 Fifth Lunar Orbit Maneuver The final and fifth Lunar bound orbit maneuver for Chandrayaan-2 spacecraft was performed successfully today (September 01, 2019) beginning at 1821 hrs IST as planned, using the onboard propulsion system. The duration of the maneuver was 52 seconds. The orbit achieved is 119 km x 127 km. All spacecraft parameters are normal. The next operation is the separation of Vikram Lander from Chandrayaan-2 Orbiter, which is scheduled on September 02, 2019, between 1245 – 1345 hrs (IST). Following this, there will be two deorbit maneuvers of Vikram Lander to prepare for its landing in the south polar region of the moon. Tentative plan for future operations after today’s maneuver are as follows, Date Time (IST) Orbit around moon Vikram Separation September 02, 2019 12:45 – 13:45 Deorbit #1 September 03, 2019 09:00 – 10:00 109 km x 120 km Deorbit #2 September 04, 2019 03:00 – 04:00 36 km x 110 km Powered Descent September 07, 2019 Vikram Touch Down September 07, 2019 01:30 – 02:30 more updates at https://www.isro.gov.in/chandrayaan2-latest-updates Quote
DarkKnight19 Posted September 1, 2019 Report Posted September 1, 2019 Ltt. One of the reasonable thread in the DB. Ilanti threads post chestey very good for members. Quote
boeing747 Posted September 1, 2019 Report Posted September 1, 2019 3 hours ago, DarkKnight19 said: Ltt. One of the reasonable thread in the DB. Ilanti threads post chestey very good for members. +1111 Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.