5 minutes ago, Rendu said:

Intha fast ga construct chesthunnaru......standards maintain chesthunnaru antava?...malla cyclone vacchinappudu kulipoduga?!

 

2samao9.jpg

correctga plan cheste complete seydam pedha vishayam kadu...work force and material delay avvakunda unte chalu..scheduling antaru danne..works without dependency will be handled in parallel...masterslo managementlo course undi..2samao9.jpg

Link to comment
Share on other sites

1 minute ago, idibezwada said:

correctga plan cheste complete seydam pedha vishayam kadu...work force and material delay avvakunda unte chalu..scheduling antaru danne..works without dependency will be handled in parallel...masterslo managementlo course undi..2samao9.jpg

America lo steel kabatti.....ez ga construct chestharu..... Manadi cement/sand ga ...govt is pushing them way too much in my opinion..... So Vallu standards maintain cheyatledu emo ani na doubt....monna Calcutta lo flyover kulipoyindi..... So inkokati jaragakudadu ani nenu korukuntunna

Link to comment
Share on other sites

5 minutes ago, Rendu said:

America lo steel kabatti.....ez ga construct chestharu..... Manadi cement/sand ga ...govt is pushing them way too much in my opinion..... So Vallu standards maintain cheyatledu emo ani na doubt....monna Calcutta lo flyover kulipoyindi..... So inkokati jaragakudadu ani nenu korukuntunna

ade mayya septundi...doesnt matter if its steel or concrete...ippudu ground floor slab posi adi procure ayyedaka wait chestaru manollu...kani parallelga migatha panulanni complete cheyochu...like carpentry works for windows n doors..alage 1st floor slab aipogane 2nd floor slab n in parallel 1st floor walls n electric work ala..aina quality chudataniki review engineer untadu kada..fastga complete avadaniki quality material vadataniki link endi

Link to comment
Share on other sites

12 minutes ago, posaanisam said:

new tech cement okati vachindi ga.. fast dry adi bt still  inta fast ga asalu ela possible o ardam kavatledu

prefabricated tho possible india lo migatha places lo kooda chesthunnaru. China lo aithe 15 stores builiding within 6 days complete chesaaru

 

 

Link to comment
Share on other sites

2 hours ago, idibezwada said:

ade mayya septundi...doesnt matter if its steel or concrete...ippudu ground floor slab posi adi procure ayyedaka wait chestaru manollu...kani parallelga migatha panulanni complete cheyochu...like carpentry works for windows n doors..alage 1st floor slab aipogane 2nd floor slab n in parallel 1st floor walls n electric work ala..aina quality chudataniki review engineer untadu kada..fastga complete avadaniki quality material vadataniki link endi

Nuvvu cheppina renditiki......time anedi okati vuntundi ga.....nuvvu construct chesina building .....how reliable can it be?

Review engineer meeda vadi supervisor pressure vundocchu emo?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...