Jump to content

Telangana lifeline Kaleshwaram Project sets records


snoww

Recommended Posts

9 minutes ago, ariel said:

Anthega @3$%

 

Just now, Khadgam said:

Kamarao gadi sulla seeke andhrawear commode lk... nee jathi ni britishers baga dengii ila orruthunnav ra nakodaka...

 

Link to comment
Share on other sites

17 minutes ago, Justice_Chowdary said:

Langa lks for a reason. Slavery lks ki enni chooinchina , banisa  brathukule kavali antaru. Anduke non stop gang bang from 300 decades . Inka realize avvaleru. Valla puttake antha..

monna nizams, ninna andorollu, nedu dora lu, evaru vachi em chesina noru moosuku kurchovadame engili methukulu kosam..

acha, andhuke ga kattubattal toh without capital bayataki 10garu,

eppudu okadimida depend avvadame,

chennai vallu 10gina shiggu raledh, TG vallu 10gina shiggu raledh.. inka mararu.. ii sari capital kosam ae orissa or MH kallu pattukuntar le.

kaleshwaram proj ki eela aiyya asthi rasichinattu aa yedupu endhuku vaari, atu central help chestha anna kuda, polavaram proj construction ki moham ledhu..  adi chusuko vachu gaa

Link to comment
Share on other sites

2 minutes ago, maidhanam1 said:

acha, andhuke ga kattubattal toh without capital bayataki 10garu,

eppudu okadimida depend avvadame,

chennai vallu 10gina shiggu raledh, TG vallu 10gina shiggu raledh.. inka mararu.. ii sari capital kosam ae orissa or MH kallu pattukuntar le.

kaleshwaram proj ki eela aiyya asthi rasichinattu aa yedupu endhuku vaari, atu central help chestha anna kuda, polavaram proj construction ki moham ledhu..  adi chusuko vachu gaa

Inthe ilanti sollu vagadame

are ma dabbulu waste ayyaya ma meeda intha bharam padutunda ani ledu 

enthasepu pakkana vadini edo hatred to anadame 

Maidanam for a reason

Link to comment
Share on other sites

2 minutes ago, maidhanam1 said:

acha, andhuke ga kattubattal toh without capital bayataki 10garu,

eppudu okadimida depend avvadame,

chennai vallu 10gina shiggu raledh, TG vallu 10gina shiggu raledh.. inka mararu.. ii sari capital kosam ae orissa or MH kallu pattukuntar le.

kaleshwaram proj ki eela aiyya asthi rasichinattu aa yedupu endhuku vaari, atu central help chestha anna kuda, polavaram proj construction ki moham ledhu..  adi chusuko vachu gaa

Evari gurnchi talking?? Chaalaa mande yella10gaaar vallani @3$%

  • Haha 1
Link to comment
Share on other sites

2 minutes ago, jobseeker1 said:

Evari gurnchi talking?? Chaalaa mande yella10gaaar vallani @3$%

Prathi valla daggara mosapoyindi valle

kashtapadi revenue penchedi valle

evadina fight cheste tirigi defend kuda cheyakunda mounam ga venudirigindi valle

valla tyagaphalalu mingutunna meku matlade arhata kuda undi anukodam

andhrodu range vere

%$#$

Link to comment
Share on other sites

1 minute ago, ariel said:

Prathi valla daggara mosapoyindi valle

kashtapadi revenue penchedi valle

evadina fight cheste tirigi defend kuda cheyakunda mounam ga venudirigindi valle

valla tyagaphalalu mingutunna meku matlade arhata kuda undi anukodam

andhrodu range vere

%$#$

idhi matram ROFL,

chennai already developed kabatti - valla sank@ n@karu,

Hyd 1920 ke Ind lo top 1 city, andhuke after independence valla s@nka n@karu.

ippudu amr@vathi construct chatha kaka, evari s@nka nakali ani chusthunnaru..

Link to comment
Share on other sites

3 minutes ago, kothavani said:

cool bros just loose tongue valla ovariki emi raadu just some stress, stick to the topic, please stop using cuss words

adhe ga bro cheppedhi. TRS, KCHR, cong  ila politically emaina comments esina lite..enjoy chesthamu kuda,  no body cares

TG ppl antu posts pedthunnaru chudu, MC ID's ni antunna

  • Upvote 1
Link to comment
Share on other sites

2 minutes ago, ariel said:

Prathi valla daggara mosapoyindi valle

kashtapadi revenue penchedi valle

evadina fight cheste tirigi defend kuda cheyakunda mounam ga venudirigindi valle

valla tyagaphalalu mingutunna meku matlade arhata kuda undi anukodam

andhrodu range vere

%$#$

Iyanni cheste majjika ichi dhanda yesi dandam pedtaaru kaani cbn laaga vennipotu podichi dhanda yenduku yestaar man?? 

Aalochinchu vaaa 

Link to comment
Share on other sites

18 hours ago, ticket said:

😂free ga vachina pisal tho akasam loki ki kuda lift cheyyagalaru water ni..pinkies..

Nandamuri Vamsham na jenda.. Nandamuri Vamsham aasayam naa ajenda.. Vardhillali Nandamuri Vamsham

Link to comment
Share on other sites

16 hours ago, ariel said:

Kaleshwaram is a small temple town on Godavari right bank about 300 km downstream of major dam, Sriram Sagar project, known as SRSP. At Kaleshwaram, the major tributary Pranahita, which merges with Godavari, brings large quantity of water. The place is also known as Sangam and Dakshin Ganga.

The project proposes to lift about 180 TMC (about 5 billion cubic meters) of water. It includes construction of barrages, high speed pumps for transport of water upstream for providing for irrigation. Besides, it involves constructions of network storage dams, series of tunnels, canals water passing through several stages of pumping and reverse flow into Godavari main river. 

The Detailed Project Report (DPR) states that it would provide water for irrigation for 18.25 lakh acres and stabilise water for another 6 lakh acres of existing irrigated area. The estimated project cost is 80,450 crore and the annual maintenance costs including interest payments will be around 13,923 crore. The projected net annual benefits are estimated at around 21,521 crore.

Independent analysis of the DPR by civil society organisations involved in water management and resettlement of evictees have questioned the proposed benefits accruing to farmers. They argue that: (a) the 180 TMC water is not enough for 26 lakh acres for any meaningful irrigation; (b) the crop yields have been grossly inflated almost 10 times as compared to the current levels for projecting highly favourable benefits/outcomes; and (c) the complete omission of social and ecological costs in the report.

Another disturbing conclusion, which is also acknowledged in the DPR, is that the operation and maintenance costs will be around 53,000 per acre. The report, prepared by civil society organisations in November 2016, has called for an impartial and unbiased Independent Review of the project to assess the claims made by the Telangana government.

The DPR, for example, states that out of 21,521 crore of annual benefits, the agriculture sector will contribute 12,730 crore. Even these figures are not properly accounted in the DPR. The benefits from the agriculture sector in the report are based on three assumptions. They include: (a) the project will provide irrigation to 24 lakh acres; (b) increases in the yield of 12 crops will be of 500-900 per cent more than current reported yields; and (c) all the produce will be getting higher prices.

A crop like chillies, for example, will get close to 4,500 crore annually because of the projected increase in the yield from 500 kg per every hectare to 4,500 kg per hectare.

At present, the cultivation of chillies in the entire Telangana State is spread over 80,000 hectares with the production turnover of 2,27,000 tonnes or 2.8 tonnes on an average per hectare. The Kaleshwaram lift irrigation project aims generate production of 52,20,000 tonnes of chillies at an average yield of 4.5 tonne per hectare Consequently, the increase in production of chillies is estimated to be 20 times of the current levels of output.

Normally, when production of chillies increase by 20 per cent more than the average of the previous year, prices tend to slump to historic lows with few buyers in the market. Indeed, this was the case in 2017, when farmers in their frustration actually burnt their produce after prices dropped. It is not surprising that this became a major issue with violent protests on the streets. Against this backdrop, it would be difficult to imagine the market response if chillies production increased by 20 times.

The farmer who is cultivating chillies, for example, is currently getting net income of 12,000 per acre as net benefit. But, with KLIP water, the same farmer is expected to get 1,56,000 per acre, which is 13 times more than the current return. Significantly, this is also the case with other crops.

Even the data on the projected increase in the area of irrigation, yields, and profit margins in the DPR are based on questionable assumptions which fail to reflect the current realities of costs of products and prices of the products at the market place.

It is clear as daylight that the figures indicated in the DPR fail to reflect the current realities of cultivation of these crops. In short, this project is unlikely to generate benefits of more than 4,000 crore while the State would spend 13,000 crore every year. The Telangana government is going to spend four times more on the operation and maintenance costs than all the benefits that would accrue to farmers.

In addition to this, the project will displace at least 30,000 people in 19 villages. Further, the project is going to affect the total land of around 100,000 acres (40,015 hectares). Considering all other costs, this project is going to be a major burden for Telangana people and farmers for generations to come. 

 

 

Nandamuri Vamsham na jenda.. Nandamuri Vamsham aasayam naa ajenda.. Vardhillali Nandamuri Vamsham

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...