Jump to content

Hyderabad Metro


Recommended Posts

Posted
On 12/4/2017 at 1:59 PM, perugu_vada said:

Oh ok, but this is fine, increase chesina at max another 5-10mins save autundemo time anthe

but speed increase aithe, may be expenses on running metro might go down for l&t

March, 2018 varaku slow gane vuntayi anta after that spped would be increased

Posted
40 minutes ago, Kool_SRG said:

20171206a_001134012.jpg

 

20171206a_002134017.jpg

kanipistalevvu pics

Posted
27 minutes ago, perugu_vada said:

 

Still pics not visible @Kool_SRG

Eenadu e paper first page lone chudali ika ayithe ...I can see it here.

Posted

ఏ రోజు ఎంత మంది...
తేదీ                     ప్రయాణికులు
29 నవంబర్‌           2.0 లక్షలు
30                      1.20 లక్షలు
1 డిసెంబర్‌           1.50 లక్షలు
2                       2.10 లక్షలు
3                      2.40 లక్షలు
4                     1.20 లక్షలు
5                     1.02 లక్షలు

Posted
Just now, TampaChinnodu said:

ఏ రోజు ఎంత మంది...
తేదీ                     ప్రయాణికులు
29 నవంబర్‌           2.0 లక్షలు
30                      1.20 లక్షలు
1 డిసెంబర్‌           1.50 లక్షలు
2                       2.10 లక్షలు
3                      2.40 లక్షలు
4                     1.20 లక్షలు
5                     1.02 లక్షలు

Daily 1 lac minimum. Have to see if this number keeps up.

Posted
Just now, TampaChinnodu said:

Daily 1 lac minimum. Have to see if this number keeps up.

up eppude kadhu parking lots baguntay ...janalu bikes ni drop chesi potharu ....in long runlo avachu ...enka hitech city side metro veyaledhu anukunta ...ahdi vasthay chala ekuva vastahru anukunta.

Posted
2 minutes ago, TampaChinnodu said:

Daily 1 lac minimum. Have to see if this number keeps up.

Kastam... This is the initial rush to see and feel the metro... just a joy ride I guess... Once the IT corridor metro is open then the real people using the metro might increase...

Posted

ive known ppl who are riding it just to see the city from an elevated perspective  @3$%

Posted
2 minutes ago, sattipandu said:

ive known ppl who are riding it just to see the city from an elevated perspective  @3$%

Ipude lechinava man..

Posted
53 minutes ago, argadorn said:

up eppude kadhu parking lots baguntay ...janalu bikes ni drop chesi potharu ....in long runlo avachu ...enka hitech city side metro veyaledhu anukunta ...ahdi vasthay chala ekuva vastahru anukunta.

Ameerpet-Hitech City June 1st ki complete cheyyamani deadline fix chesarata, ivvala news lo vachindi same posted here on top..

Adi vasthe inka flow perugutaadi.

Posted
8 minutes ago, Kool_SRG said:

Ameerpet-Hitech City June 1st ki complete cheyyamani deadline fix chesarata, ivvala news lo vachindi same posted here on top..

Adi vasthe inka flow perugutaadi.

Lb nagar- miyapur via Ameerpet 

idhi aithe chaaalayyyaa city la sagam traffic dhareedhram 10gesthadhi

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...